UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

As at July 31, 2024

Commission File Number: 001-31965

Taseko Mines Limited
(Translation of registrant's name into English)

12th Floor - 1040 West Georgia St., Vancouver, BC, V6E 4H1
(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

[           ] Form 20-F   [ x ] Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [           ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [           ]


SUBMITTED HEREWITH

Exhibits

Exhibit   Description
     
99.1   Interim Financial Statements for the period ended June 30, 2024
99.2   Management's Discussion and Analysis for the period ended June 30, 2024


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  Taseko Mines Limited
  (Registrant)
     
Date: July 31, 2024 By: /s/ Bryce Hamming
   
    Bryce Hamming
  Title: Chief Financial Officer

 


Taseko Mines Limited: Exhibit 99.1 - Filed by newsfilecorp.com

 

 

 

Condensed Consolidated Interim Financial Statements
June 30, 2024
(Unaudited)

 

 

 


TASEKO MINES LIMITED
Condensed Consolidated Interim Balance Sheets
(Cdn$ in thousands)
(Unaudited)

            June 30,     December 31,  
      Note     2024     2023  
                     
ASSETS                    
Current assets                    
  Cash and equivalents           198,627     96,477  
  Accounts receivable      9     34,362     16,514  
  Inventories     10     135,728     122,942  
  Prepaids           10,326     8,465  
  Other financial assets      11     1,044     5,057  
            380,087     249,455  
                     
Property, plant and equipment     12     1,554,850     1,286,001  
Inventories     10     35,169     17,554  
Other financial assets      11     1,659     7,896  
Goodwill            5,640     5,462  
            1,977,405     1,566,368  
                     
LIABILITIES                    
Current liabilities                    
  Accounts payable and accrued liabilities           110,295     71,748  
  Current portion of long-term debt      13     28,524     27,658  
  Deferred revenue     15     10,404     10,346  
  Current portion of Cariboo consideration payable     3c     15,175     14,384  
  Interest payable           10,502     13,896  
  Current income tax payable           4,715     3,157  
  Copper price derivative liability     6     2,435     -  
            182,050     141,189  
                     
Long-term debt     13     725,270     610,233  
Cariboo consideration payable     3     116,727     55,997  
Deferred revenue     15     60,451     59,720  
Florence royalty obligation     14     72,494     -  
Florence copper stream     6     31,098     -  
Provision for environmental rehabilitation           168,439     145,786  
Deferred tax liabilities           150,043     114,723  
Other financial liabilities     16b     9,364     4,572  
            1,515,936     1,132,220  
                     
EQUITY                    
Share capital     16     490,954     486,136  
Contributed surplus           55,652     54,833  
Accumulated other comprehensive income ("AOCI")           30,298     16,557  
Deficit           (115,435 )   (123,378 )
            461,469     434,148  
            1,977,405     1,566,368  
                     
Commitments and contingencies     18              
Subsequent events     6b              

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED
Condensed Consolidated Interim Statements of Comprehensive (Loss) Income
(Cdn$ in thousands, except share and per share amounts)
(Unaudited)
          Three months ended June 30,     Six months ended June 30,  
    Note     2024     2023     2024     2023  
                               
Revenues   4     137,730     111,924     284,677     227,443  
Cost of sales                              
  Production costs   5     (94,916 )   (84,260 )   (202,420 )   (158,640 )
  Depletion and amortization   5     (13,721 )   (15,594 )   (28,745 )   (27,621 )
Other operating costs   5     (10,435 )   -     (10,435 )   -  
Insurance recovery   5     26,290     -     26,290     -  
Earnings from mining operations         44,948     12,070     69,367     41,182  
                               
General and administrative         (3,517 )   (3,590 )   (6,646 )   (6,890 )
Share-based compensation expense   16b     (2,512 )   (344 )   (7,952 )   (3,729 )
Project evaluation expense         (542 )   (212 )   (759 )   (537 )
(Loss) gain on derivatives   6     (11,688 )   4,559     (16,909 )   343  
Other (expense) income         (399 )   (230 )   (261 )   204  
Income before financing costs and income taxes         26,290     12,253     36,840     30,573  
                               
Finance expenses, net   7     (25,006 )   (12,711 )   (43,769 )   (24,099 )
Foreign exchange (loss) gain         (5,913 )   11,127     (17,930 )   11,990  
Call premium on settlement of debt   7     (9,571 )   -     (9,571 )   -  
Gain on Cariboo acquisition   3     -     -     47,426     46,212  
Gain on acquisition of control of Gibraltar   3b     -     -     14,982     -  
(Loss) income before income taxes         (14,200 )   10,669     27,978     64,676  
                               
Income tax recovery (expense)   8     3,247     (678 )   (20,035 )   (20,897 )
Net (loss) income         (10,953 )   9,991     7,943     43,779  
                               
                               
Other comprehensive income (loss):                              
Items that will remain permanently in other comprehensive income (loss):                              
Loss on financial assets          (354 )   (435 )   (289 )   (820 )
Items that may in the future be reclassified to profit (loss):                               
Foreign currency translation reserve         3,981     (7,570 )   14,030     (8,237 )
Total other comprehensive income (loss)         3,627     (8,005 )   13,741     (9,057 )
                               
Total comprehensive (loss) income         (7,326 )   1,986     21,684     34,722  
                               
(Loss) earnings per share                              
Basic   17     (0.04 )   0.03     0.03     0.15  
Diluted   17     (0.04 )   0.02     0.03     0.14  
                               
Weighted average shares outstanding (thousands)                              
Basic   17     291,832     288,519     291,148     288,266  
Diluted   17     291,832     291,112     293,440     291,081  

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED
Condensed Consolidated Interim Statements of Cash Flows
(Cdn$ in thousands)
(Unaudited)

          Three months ended June 30,     Six months ended June 30,  
    Note     2024     2023     2024     2023  
                               
Operating activities                              
Net (loss) income for the period          (10,953 )   9,991     7,943     43,779  
Adjustments for:                              
Depletion and amortization   12     13,721     15,594     28,745     27,621  
Income tax (recovery) expense    8     (3,247 )   678     20,035     20,897  
Finance expenses, net   7     25,006     12,711     43,769     24,099  
Share-based compensation expense   16b     2,585     417     8,252     4,026  
Loss (gain) on derivatives   6     11,688     (4,559 )   16,909     (343 )
Foreign exchange loss (gain)          5,408     (10,966 )   19,096     (11,916 )
Gain on Cariboo acquisition   3a, 3c     -     -     (47,426 )   (46,212 )
Unrealized loss on acquisition of control of Gibraltar   3b     7,824     -     6,196     -  
Deferred revenue deposit   15     -     13,586     -     13,586  
Amortization of deferred revenue   15     (1,249 )   (1,411 )   (2,839 )   (2,783 )
Call premium on settlement of debt   7     9,571     -     9,571     -  
Other operating activities         (105 )   (67 )   (147 )   (316 )
Net change in working capital :                              
Insurance receivable   5     (26,314 )   -     (26,314 )   -  
Net change in working capital - other   19     776     (2,705 )   10,495     (11,170 )
Cash provided by operating activities         34,711     33,269     94,285     61,268  
                               
Investing activities                              
Gibraltar capitalized stripping costs    12     (10,732 )   (8,866 )   (24,689 )   (21,587 )
Gibraltar sustaining capital expenditures    12     (4,505 )   (20,437 )   (9,825 )   (25,128 )
Gibraltar capital project expenditures   12     (469   (10,271 )   (3,032 )   (17,609 )
Florence Copper development costs   12     (56,051 )   (6,635 )   (86,813 )   (16,509 )
Other project development costs    12     (620 )   (256 )   (1,024 )   (529 )
Acquisition of Cariboo, net   3a, 3c     (4,549 )   -     (9,665 )   2,948  
Release of restricted cash   11     -     -     12,500     -  
Purchase of copper price options   6     (4,785 )   -     (6,770 )   -  
Other investing activities         910     859     1,832     840  
Cash used for investing activities         (80,801 )   (45,606 )   (127,486 )   (77,574 )
                               
Financing activities                              
Interest paid         (7,457 )   (2,825 )   (31,066 )   (23,550 )
Net proceeds from issuance of senior secured notes   13a     670,419     -     670,419     -  
Repayment of senior secured notes and call premium   13a     (556,491 )   -     (556,491 )   -  
Revolving credit facility repayment   13b     (26,494 )   (11,765 )   (26,494 )   (17,502 )
Repayment of Gibraltar equipment financings   13e     (7,518 )   (271 )   (13,561 )   13,247  
Net proceeds from Florence financings   6, 14     12,136     11,067     90,526     11,067  
Share-based compensation         2,416     176     2,178     (1,455 )
Cash provided by (used for) financing activities         87,011     (3,618 )   135,511     (18,193 )
Effect of exchange rate changes on cash and equivalents         45     (748 )   (160 )   (797 )
Increase (decrease) in cash and equivalents         40,966     (16,703 )   102,150     (35,296 )
Cash and equivalents, beginning of period         157,661     102,265     96,477     120,858  
Cash and equivalents, end of period         198,627     85,562     198,627     85,562  
                               
Supplementary cash flow disclosures   19                          

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED
Condensed Consolidated Interim Statements of Changes in Equity
(Cdn$ in thousands)
(Unaudited)
       Share       Contributed                     
       capital       surplus       AOCI       Deficit       Total   
                                 
Balance at January 1, 2023     479,926     55,795     26,792     (206,104 )   356,409  
Share-based compensation     -     3,387     -     -     3,387  
Exercise of options     723     (256 )   -     -     467  
Settlement of performance share units     3,833     (5,755 )   -     -     (1,922 )
Total comprehensive income (loss) for the period      -     -     (9,057 )   43,779     34,722  
Balance as at June 30, 2023     484,482     53,171     17,735     (162,325 )   393,063  
                                 
Balance as at January 1, 2024     486,136     54,833     16,557     (123,378 )   434,148  
Share-based compensation     -     385     -     -     385  
Exercise of options     4,818     1,357     -     -     6,175  
Settlement of performance share units     -     (923 )   -     -     (923 )
Total comprehensive income for the period      -     -     13,741     7,943     21,684  
Balance as at June 30, 2024     490,954     55,652     30,298     (115,435 )   461,469  

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

1. REPORTING ENTITY

Taseko Mines Limited (the "Company" or "Taseko") is a corporation governed by the British Columbia Business Corporations Act. These unaudited condensed consolidated interim financial statements of the Company as at and for the three and six months ended June 30, 2024 comprise the Company and its wholly-owned subsidiaries. The Company is principally engaged in the production and sale of metal concentrates, as well as related activities including mine permitting and development, within the province of British Columbia, Canada and the State of Arizona, USA.

As a result of the Company's acquisition of Cariboo Copper Corporation ("Cariboo"), after March 25, 2024, the financial results of the Company reflect its 100% beneficial interest in the Gibraltar mine ("Gibraltar") (Note 3a). The financial results of the Company before March 15, 2023 reflect its 75% beneficial interest in Gibraltar and the financial results between March 16, 2023 and March 24, 2024 reflect its 87.5% beneficial interest in Gibraltar (Note 3c).

The Company finalized the accounting for the acquisition of its 50% interest in Cariboo from Sojitz and the related 12.5% interest in Gibraltar in the fourth quarter of 2023. In accordance with the accounting standards for business combinations, the comparable financial statements as at June 30, 2023 and for the three and six months then ended have been revised to reflect the changes in finalizing the consideration paid and the allocation of the purchase price to the assets and liabilities acquired (Note 3c).

2. SIGNIFICANT ACCOUNTING POLICIES

(a) Statement of compliance

These unaudited condensed consolidated interim financial statements have been prepared in accordance with International Accounting Standard ("IAS") 34, Interim Financial Reporting and follow the same accounting policies and methods of application as the Company's most recent annual consolidated financial statements. These unaudited condensed consolidated interim financial statements do not include all of the information required for full consolidated annual financial statements and should be read in conjunction with the consolidated annual financial statements of the Company as at and for the year ended December 31, 2023, prepared in accordance with International Financial Reporting Standards ("IFRS") as issued by the International Accounting Standards Board ("IASB").

These unaudited condensed consolidated interim financial statements were authorized for issue by the Company's Audit and Risk Committee on July 31, 2024.

(b) Use of judgments and estimates

In preparing these unaudited condensed consolidated interim financial statements, management has made judgments, estimates and assumptions that affect the application of accounting policies, including the accounting for the Cariboo acquisition (Note 3) and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates.

The significant judgments made by management in applying the Company's accounting policies and the key sources of estimation uncertainty were the same as those applied to the annual consolidated financial statements as at and for the year ended December 31, 2023.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

2. SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

(c) IFRS Pronouncements

Several new accounting standards, amendments to existing standards and interpretations have been published by the IASB. Management anticipates that all relevant pronouncements will be adopted for the first period beginning on or after the effective date of the new standard.

New standards, amendments and pronouncements that became effective for the period covered by these statements have not been disclosed as they did not have a material impact on the Company's unaudited condensed consolidated interim financial statements.

3. ACQUISITION OF CARIBOO COPPER CORPORATION

a) Acquisition of Cariboo from Dowa and Furukawa

On March 25, 2024 ("Acquisition Date"), the Company completed the acquisition of the remaining 50% of Cariboo from Dowa Metals & Mining Co., Ltd. ("Dowa") and Furukawa Co., Ltd. ("Furukawa") which gives the Company an additional 12.5% effective interest in Gibraltar bringing its total effective interest to 100%. Gibraltar is operated through a joint venture which is owned 75% by Taseko and 25% by Cariboo.

The acquisition price payable to Dowa and Furukawa is a minimum of $117 million and a maximum of $142 million payable over a 10-year period, with the quantum and timing of payment depending on LME copper prices and the cashflow of Gibraltar.

An initial $5 million payment was made to Dowa and Furukawa on closing. The remaining cash consideration will be payable in annual payments commencing in March 2026. The amounts owing to Dowa and Furukawa are non-interest bearing. The annual payments will be based on the average LME copper price of the previous calendar year, subject to an annual cap based on a percentage of cashflow from Gibraltar. At copper prices below US$4.00 per pound, the annual payment will be $5 million, increasing pro-rata to a maximum annual payment of $15.25 million at copper prices of US$5.00 per pound or higher. The annual payments also cannot exceed 6.25% of Gibraltar's annual cashflow for the 2025 to 2028 calendar years, and 10% of Gibraltar's cashflow for the 2029 to 2033 calendar years. Any outstanding balance on the minimum acquisition amount of $117 million will be payable in a final balloon payment in March 2034.

The annual payments were estimated as at the Acquisition Date based on forecasted copper prices over the next 10 years. The total estimated purchase consideration was then discounted to determine its fair value and the amount as at the Acquisition Date was $71,116.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

3. ACQUISITION OF CARIBOO COPPER CORPORATION (CONTINUED)

a) Acquisition of Cariboo from Dowa and Furukawa (continued)

The purchase consideration has been allocated to the assets acquired and liabilities assumed, including the additional 12.5% effective interest in the Gibraltar Joint Venture, based upon their estimated fair values at the Acquisition Date. The following sets forth the preliminary allocation of the purchase price:

Cash and cash equivalents   9,884  
Accounts receivable and other assets   3,046  
Reclamation deposits   6,262  
Inventory   24,634  
Property, plant and equipment   126,194  
Accounts payable and other liabilities   (7,353 )
Debt   (7,143 )
Deferred tax liabilities   (16,955 )
Provision for environmental rehabilitation   (20,027 )
Total fair value of net assets acquired   118,542  

The fair value of the net assets acquired at March 25, 2024 was determined using a discounted cash flow model for the 12.5% interest in Gibraltar and also considering cash and working capital of Cariboo. The discounted cash flow model included key assumptions on future production and estimated remaining reserves of the Gibraltar, operating assumptions, metal prices, operating and capital costs, and foreign exchange rates, and a discount rate based on an estimate of the Company's weighted average cost of capital. The discounted cash flow model was analyzed using a range of inputs and assumptions and provided a range of values, of which the Company recorded $118,542 at the lower end of its fair value estimate range.

To account for the difference between the fair value of net assets acquired of $118,542 and the total fair value of consideration payable of $71,116, the Company recognized a bargain purchase gain on Cariboo acquisition on the income statement of $47,426 for the six months ended June 30, 2024.

The fair value of inventories was determined based on their net realizable value, whereby the future estimated cash flows from sales of payable metal produced were adjusted for costs to complete. The fair values of accounts receivable, reclamation deposits and accounts payable and other liabilities were determined to approximate their book values. The fair value of debt owed to third parties was determined based on the principal amounts outstanding as the interest rate on the debt was considered at market. Deferred tax liabilities were determined based on 50% of the available tax pools and other tax attributes of Cariboo. The fair value of the reclamation and closure cost provisions were estimated using discounted cash flows of future expenditures to settle the obligation for disturbances at the Acquisition Date and discount rates. The fair value of property, plant and equipment other than mineral properties and the major mill equipment and infrastructure were determined based on the estimated fair value of plant and other equipment in use and independent equipment appraisals on certain mobile equipment. The remaining residual portion of the fair value of net assets acquired was allocated to mineral properties and the major mill equipment and infrastructure within property, plant and equipment which are amortizable over the estimated remaining life of Gibraltar on a units of production basis.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

3. ACQUISITION OF CARIBOO COPPER CORPORATION (CONTINUED)

a) Acquisition of Cariboo from Dowa and Furukawa (continued)

As at June 30, 2024, the estimated present value of the outstanding Cariboo consideration payable to Dowa and Furukawa is as follows:

Consideration payable   66,116  
Accretion on consideration payable   2,777  
Long term Cariboo consideration payable   68,893  

From the Acquisition Date to June 30, 2024, $1,897 of the Company's consolidated net income relates to its share of Cariboo and the Company recognized $532 of acquisition related costs that were included in other expenses.

The following table presents unaudited pro forma results for the six months ended June 30, 2024, as though the acquisition had taken place as of January 1, 2024. Additionally, pro forma net income was adjusted to exclude acquisition-related costs incurred.

Pro forma information   Six months ended June 30, 2024  
Revenue   300,093  
Net income   9,840  

b) Deemed Disposition at Fair Value of 87.5% Gibraltar Interest on Acquisition of Control

Prior to the Company's acquisition of the remaining 50% of Cariboo from Dowa and Furukawa on March 25, 2024, the Company had joint control over the joint arrangement and proportionately consolidated its 87.5% effective interest of all the Gibraltar Joint Venture's assets, liabilities, income and expenses. On March 25, 2024, the Company acquired the remaining 12.5% interest through its purchase of Cariboo thereby increasing its effective interest to 100% in Gibraltar. As a result, the Company obtained full control and transitioned from joint control and a joint arrangement under IFRS 11 Joint Arrangements to full control under IFRS 10 Consolidated Statements and IFRS 3 Business Combinations. This transition in applicable standards necessitates the need for the Company to reassess its previously held 87.5% interest in Gibraltar and remeasure this interest at fair value as of the March 25, 2024 acquisition date, with any gains or losses recognized immediately in the statement of comprehensive income. Additionally, the Company is required to measure all identifiable assets acquired and liabilities assumed at their fair values on this deemed acquisition date.

Management assessed whether there was a gain on the date of the acquisition based upon it's review of estimated fair values of the assets acquired and liabilities assumed. The fair value of the net assets acquired at March 25, 2024 was determined using a discounted cash flow model for the 87.5% interest in Gibraltar and also considering cash and working capital of Gibraltar Mines Ltd, a wholly-owned subsidiary of Taseko which owns the 75% interest in the Gibraltar joint venture and the 50% interest of Cariboo held by Taseko immediately before the deemed disposal and reacquisition. The discounted cash flow model included key assumptions on future production and estimated remaining reserves of Gibraltar, operating assumptions, metal prices, operating and capital costs, and foreign exchange rates, and a discount rate based on an estimate of the Company's weighted average cost of capital. The discounted cash flow model was analyzed using a range of inputs and assumptions and provided a range of values, of which the Company recorded net asset value at the lower end of its fair value estimate range. Based on the assessment performed, a gain of $14,982 was realized from the fair value adjustments of the assets acquired and liabilities assumed. This gain was solely attributable to the inventory's increased fair value.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

3. ACQUISITION OF CARIBOO COPPER CORPORATION (CONTINUED)

b) Deemed Disposition at Fair Value of 87.5% Gibraltar Interest on Acquisition of Control (continued)

The fair value of inventories was determined based on their net realizable value, whereby the future estimated cash flows from sales of payable metal produced were adjusted for costs to complete. For finished goods inventory consisting of copper concentrate inventory, the fair value as at the deemed acquisition date was determined to be $37,717 compared to the book value of $22,735, which resulted in a gain of $14,982. This gain was immediately recognized in the statement of comprehensive income for the six months ended June 30, 2024.

The fair values of accounts receivable, reclamation deposits and accounts payable and other liabilities were determined to approximate their book values. The fair value of debt owed to third parties was determined based on the principal amounts outstanding as the interest rate on the debt was considered at market. Deferred tax liabilities were determined based on the tax pools and attributes of Gibraltar Mines Ltd. which owns the 75% effective interest and 50% of the available tax pools and tax attributes of Cariboo. The fair value of the reclamation and closure cost provisions were estimated using discounted cash flows of future expenditures to settle the obligation for disturbances at the Acquisition Date and discount rates. The fair value of property, plant and equipment other than mineral properties and the major mill equipment and infrastructure were determined based on the estimated fair value of plant and other equipment in use and independent equipment appraisals on certain mobile equipment. The remaining residual portion of the fair value of net assets acquired was allocated to mineral properties and the major mill equipment and infrastructure within property, plant and equipment which are amortizable over the estimated remaining life of Gibraltar on a units of production basis.

The assets acquired and liabilities assumed for the Company's 87.5% effective interest in Gibraltar on March 25, 2024 were estimated on a preliminary basis as follows:

Cash and cash equivalents   5,122  
Accounts receivable and other asset   21,302  
Inventory   172,440  
Property, plant and equipment   801,700  
Accounts payable and other liabilities   (50,192 )
Debt   (50,002 )
Provision for environmental rehabilitation   (140,190 )
Total fair value of net assets   760,180  

Between March 26 and March 31, 2024, the Company sold $33,619 of concentrate inventory with a gross profit of $13,354 ($11,685 at 87.5% interest) that it wrote up to fair value on the March 25, 2024 deemed acquisition date. The remaining inventory of copper concentrate written up to fair value of $9,486 with a gross profit of $3,768 ($3,297 at 87.5% interest) was sold in April 2024.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

3. ACQUISITION OF CARIBOO COPPER CORPORATION (CONTINUED)

c) Acquisition of Cariboo from Sojitz in 2023

On March 15, 2023, the Company completed the acquisition of an additional 12.5% interest in the Gibraltar from Sojitz Corporation ("Sojitz") pursuant to its acquisition of Sojitz's 50% interest in Cariboo.

The acquisition price consisted of a minimum amount of $60 million payable over a five-year period and potential contingent performance payments depending on Gibraltar copper revenues and copper prices over the next five years. An initial $10 million was paid to Sojitz upon closing and the remaining minimum amount is payable in $10 million annual instalments over five years. There is no interest payable on the minimum amounts and the second instalment of $10 million was paid in February 2024.

The contingent performance payments are payable annually for five years only if the average LME copper price exceeds US$3.50 per pound in a year. The payments are calculated by multiplying Gibraltar copper revenues by a price factor, which is based on a sliding scale ranging from 0.38% at US$3.50 per pound copper to a maximum of 2.13% at US$5.00 per pound copper or above. Total contingent payments cannot exceed $57 million over the five-year period, limiting the acquisition cost to a maximum of $117 million.

The total purchase consideration was discounted to determine fair value and the amounts as at March 15, 2023 were estimated as follows:

 

 

Fixed instalments payable 

51,387

Contingent performance payments payable

28,010

Total fair value of consideration payable

79,397

The purchase consideration was allocated to the assets acquired and liabilities assumed, based upon their estimated fair values at the date of acquisition. The following sets forth the allocation of the purchase price: 

    Preliminary Purchase
Price Allocation
     
Adjustment
    Final Purchase
Price Allocation
 
Cash and cash equivalents   13,467     -     13,467  
Accounts receivable and other assets   1,525     -     1,525  
Reclamation deposits   6,262     -     6,262  
Inventory   15,860     -     15,860  
Property, plant and equipment   72,304     43,275     115,579  
Deferred tax asset   5,594     2,937     8,531  
Accounts payable and other liabilities   (8,535 )   -     (8,535 )
Debt   (9,144 )   -     (9,144 )
Provision for environmental rehabilitation   (17,936 )   -     (17,936 )
Total fair value of net assets acquired   79,397     46,212     125,609  

To account for the difference between the fair value of net assets acquired of $125,609 and the total fair value of consideration payable of $79,397, the Company recognized a bargain purchase gain on Cariboo acquisition on the statement of comprehensive income of $46,212 for the six months ended June 30, 2023.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

3. ACQUISITION OF CARIBOO COPPER CORPORATION (CONTINUED)

c) Acquisition of Cariboo from Sojitz in 2023 (continued)

As at June 30, 2024, outstanding Cariboo consideration payable to Sojitz is as follows:

  Fixed consideration payable   34,615  
  Contingent performance payments payable   28,394  
Total Cariboo consideration payable   63,009  
Less current portion:      
  Fixed consideration payable   9,574  
  Contingent performance payments payable   5,601  
Long-term portion of Cariboo consideration payable   47,834  

The contingent performance payment of $4,549 for the 2023 calendar year was paid on April 1, 2024. The Company recognized $263 of acquisition-related costs that were included in other expenses in the year ended December 31, 2023.

4. REVENUE

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Copper contained in concentrate   132,580     112,932     276,886     222,055  
Copper price adjustments on settlement   627     (1,555 )   245     (1,757 )
Molybdenum concentrate   6,176     5,712     12,253     13,461  
Molybdenum price adjustments on settlement   1,400     (1,251 )   1,926     580  
Silver (Note 15)   1,393     1,514     3,120     3,046  
Total gross revenue   142,176     117,352     294,430     237,385  
Less: Treatment and refining costs   (4,446 )   (5,428 )   (9,753 )   (9,942 )
Revenue   137,730     111,924     284,677     227,443  


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

5. COST OF SALES AND OTHER OPERATIONAL COSTS

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Site operating costs   79,804     83,374     159,482     157,812  
Transportation costs   6,408     6,966     16,561     12,070  
Changes in inventories:                        
  Changes in finished goods   10,462     (3,356 )   30,854     (2,957 )
  Changes in sulphide ore stockpiles   1,161     5,410     1,178     4,143  
  Changes in oxide ore stockpiles   (2,919 )   (8,134 )   (5,655 )   (12,428 )
Production costs   94,916     84,260     202,420     158,640  
Depletion and amortization   13,721     15,594     28,745     27,621  
Cost of sales   108,637     99,854     231,165     186,261  
                         
Other operational costs:                        
  Crusher relocation costs   7,911     -     7,911     -  
  Site care and maintenance   2,524     -     2,524     -  
    10,435     -     10,435     -  
                         
Insurance recovery   (26,290 )   -     (26,290 )   -  

Site operating costs include personnel costs, non-capitalized waste stripping costs, repair and maintenance costs, consumables, operating supplies and external services.

Changes in inventories of finished goods for the three months ended June 30, 2024 included $3,768 in write-ups to net realizable value for copper concentrate inventory held at March 25, 2024 that was sold between April 1 and June 30, 2024.

Changes in inventories of finished goods for the six months ended June 30, 2024 included $17,987 in write-ups to net realizable value for copper concentrate inventory held at March 25, 2024 that was sold between March 26 and June 30, 2024. Of this write-up, $14,982 was realized during the six months ended June 30, 2024 and was included in the gain on acquisition of control of Gibraltar.

Changes in inventories of sulphide ore stockpiles for the three and six months ended June 30, 2024 included $3,191 in write-ups to net realizable value for sulphide ore stockpiles inventory held at March 25, 2024 that was processed and sold  between April 1 and June 30, 2024.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

5. COST OF SALES AND OTHER OPERATIONAL COSTS (CONTINUED)

During the three months ended June 30, 2024, the Company has recognized costs of $7,911 in the statement of income (loss) related to the in-pit primary crusher relocation project. Relocation related costs for the physical move of the primary crusher to its new location are not included in the carrying amount of property, plant and equipment.

In June 2024, operations at the Gibraltar mine were suspended for 18 days due to the unionized workforce strike which started on June 1. The Company elected to systematically shut down mining and milling operations and the mine was put into care and maintenance with only essential staff operating and maintaining critical systems. The resulting care and maintenance costs during the 18 day period amounted to $2,524 and are excluded from cost of sales. Operations at Gibraltar resumed on June 19, after the ratification of a new agreement by union members.

With the component replacement in Concentrator #2 completed in January 2024, the Company finalized its insurance claim for associated property damage and business interruption as a result of a component failure. During the three months ended June 30, 2024, the Company recognized an insurance recovery of $26,290 related to the business interruption portion of the insurance claim in the statement of income (loss) against costs of operations.

6. DERIVATIVE INSTRUMENTS

a) Derivative Instruments - Copper Price and Fuel Contracts

The following is a summary of the derivative transactions entered into by the Company during the three and six months ended June, 2023 and 2024:

Date of
purchase
 Contract Quantity  Strike price  Period  Cost
March 2024 Copper collar 42 million lbs US$3.75 per lb
US$5.00 per lb
July 2024 -
December 2024
1,985
April 2024 Copper collar 54 million lbs US$4.00 per lb
US$5.00 per lb
January 2025 -
June 2025
2,563
April 2024 Copper collar 54 million lbs US$4.00 per lb
US$5.40 per lb
July 2025 -
December 2025
2,222
February 2024 Fuel call options 12.5 million ltrs US$0.79 per ltr February 2024 -
June 2024
165
January 2023 Copper collar 42 million lbs US$3.75 per lb
US$4.70 per lb
July 2023 -
December 2023
Zero cost
January 2023 Fuel call options 12 million ltrs US$1.00 per ltr July 2023 -
December 2023
941


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

6. DERIVATIVE INSTRUMENTS (CONTINUED)

a) Derivative Instruments - Copper Price and Fuel Contracts (continued)

The following is a summary of the realized and unrealized derivative gain or loss incurred during the three and six months ended June 30, 2023 and 2024:

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Net realized loss on settled copper options and collars   1,556     1,385     3,192     2,873  
Net unrealized loss (gain) on outstanding copper options and collars   8,874     (6,053 )   9,737     (4,409 )
Realized loss on fuel call options   99     526     165     1,064  
Unrealized (gain) loss on fuel call options   (64 )   (417 )   -     129  
    10,465     (4,559 )   13,094     (343 )

Details of the outstanding copper price option contracts as at June 30, 2024 are summarized in the following table:

Contract   Quantity     Strike price     Period     Cost     Fair value  
Copper collars   42 million lbs     US$3.75 per lb
US$5.00 per lb
    H2 2024     1,985     (1,386 )
Copper collars   54 million lbs     US$4.00 per lb
US$5.00 per lb
    H1 2025     2,563     (1,915 )
Copper collars   54 million lbs     US$4.00per lb
US$5.40 per lb
    H2 2025     2,222     866  
Total   150 million lbs                       (2,435 )

b) Derivative Instruments - Florence Copper Stream

On December 19, 2022, the Company signed agreements with Mitsui & Co. (U.S.A.) Inc. ("Mitsui") to form a strategic partnership to develop the Company's Florence Copper project ("Florence Copper"). Mitsui has committed to an initial investment of US$50 million, with proceeds to be used for construction of the commercial production facility. The initial investment is in the form of a copper stream agreement (the "Copper Stream") on 2.67% of the copper produced at Florence Copper and Mitsui to pay a delivery price equal to 25% of the market price of copper delivered under the contract.

In addition, Mitsui has acquired an option to invest an additional US$50 million for a 10% equity interest in Florence Copper (the "Equity Option"). The Equity Option is exercisable by Mitsui at any time up to three years following completion of construction of the commercial production facility. If Mitsui elects to exercise its Equity Option, the Copper Stream will terminate. If the Equity Option is not exercised by Mitsui by its expiry date, the Company will have the right to buy-back 100% of the Copper Stream, otherwise, it will terminate when 40 million pounds of copper have been delivered under the agreement.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

6. DERIVATIVE INSTRUMENTS (CONTINUED)

b) Derivative Instruments - Florence Copper Stream (continued)

As part of the arrangement, Taseko and Mitsui have entered into an offtake contract for 81% of the copper cathode produced at Florence during the initial years of production. The initial offtake agreement will cease and be replaced with a marketing agency agreement if the Equity Option is exercised by Mitsui. Mitsui's offtake entitlement would also reduce to 30% if the Equity Option is not exercised by its expiry date until the Copper Stream deposit has been reduced to nil.

On January 26 and April 26, 2024, the Company received the first and second US$10 million of the US$50 million Copper Stream. The remaining amounts are payable on a quarterly instalment basis. On July 26, 2024, the Company received the third US$10 million.

For accounting purposes, the Mitsui agreement is accounted for as a financial instrument and includes derivatives that are required to be fair valued at each reporting period. The Company has determined that the carrying value of the financial instrument and fair value of the derivatives is $31,098 as at June 30, 2024 based on the timing of future instalment payments, estimates of future production, estimates of future copper prices and other relevant factors. For the three and six months ended June 30, 2024, the Company recorded an unrealized loss of $1,223 and $3,815, respectively, in the statement of comprehensive income (loss).

Proceeds from Florence copper stream   27,117  
Deferred financing fees   (102 )
Unrealized loss on Florence copper stream derivative   3,815  
Unrealized foreign exchange loss   268  
Florence copper stream as at June 30, 2024   31,098  

7. FINANCE EXPENSES

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Interest expense   13,586     11,281     28,406     22,822  
Amortization of financing fees   619     717     1,359     1,388  
Finance expense - deferred revenue (Note 15)   1,809     1,492     3,177     2,965  
Accretion on PER   697     572     1,395     1,076  
Accretion and fair value adjustment on consideration payable to Cariboo (Notes 3a and 3c)   8,399     1,451     9,954     1,451  
Accretion and fair value adjustment on Florence royalty obligation (Note 14)   2,132     -     5,548     -  
Finance income   (911 )   (757 )   (1,997 )   (1,678 )
Loss on settlement of long-term debt (Note 13a)   4,646     -     4,646     -  
Less: interest expense capitalized   (5,971 )   (2,045 )   (8,719 )   (3,925 )
    25,006     12,711     43,769     24,099  

TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

7. FINANCE EXPENSES (CONTINUED)

For the three and six months ended June 30, 2024, interest expense includes $345 (2023 - $644) and $711 (2023 - $1,050), respectively, from lease liabilities.

As part of the senior secured notes refinancing completed in April 2024, the Company redeemed its US$400 million 2026 senior secured notes on April 23, 2024, which resulted in an accounting loss of $4,646 due to write-off of deferred financing costs. $1,742 of the accounting loss was capitalized.

The Company also paid a one-time redemption call premium of $9,571 on the settlement of the 2026 Notes, which is not included in net financing expenses shown above.

For the three and six months ended June 30, 2024, $5,971 and $8,719 (2023 - $2,045 and $3,925), respectively, of borrowing costs have been capitalized to Florence Copper development costs (Note 12).

8. INCOME TAX

    Three months ended
June 30,
    Six months ended
June 30,
 
  2024     2023     2024     2023  
Current income tax expense   633     215     1,438     759  
Deferred income tax (recovery) expense    (3,880 )   463     18,597     20,138  
    (3,247 )   678     20,035     20,897  

9. ACCOUNTS RECEIVABLE

    June 30,     December 31,  
    2024     2023  
Trade and settlement receivables   4,598     11,039  
Insurance proceeds receivable   28,672     4,057  
Other receivables   1,092     1,418  
    34,362     16,514  

10. INVENTORIES

    June 30,     December 31,  
    2024     2023  
Current:            
  Sulphide ore stockpiles   73,255     57,678  
  Copper contained in concentrate   8,211     17,356  
  Molybdenum concentrate   313     711  
  Materials and supplies   53,949     47,197  
    135,728     122,942  
Long-term:            
  Oxide ore stockpiles   35,169     17,554  
    170,897     140,496  


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

11. OTHER FINANCIAL ASSETS

    June 30,     December 31,  
    2024     2023  
Current:            
  Marketable securities   1,044     1,333  
  Copper price options (Note 6a)   -     3,724  
    1,044     5,057  
Long-term:            
  Investment in private companies    1,200     1,200  
  Reclamation deposits   459     6,696  
    1,659     7,896  

The Company holds strategic investments in publicly-traded and privately owned mineral exploration and development companies, including marketable securities. Marketable securities and the investment in privately owned companies are accounted for at fair value through other comprehensive income.

In March, 2024, the Company replaced its letter or credit with the Province of British Columbia with a surety bond, which resulted in a $12,500 release of restricted cash to the Company's cash and equivalents.

12. PROPERTY, PLANT & EQUIPMENT

The following schedule shows the continuity of property, plant and equipment net book value for the three and six months ended June 30, 2024:

    Three months ended
June 30, 2024
    Six months ended
June 30, 2024
 
Net book value as at beginning of period   1,475,021     1,286,001  
Additions:            
  Gibraltar capitalized stripping costs   10,065     26,530  
  Gibraltar sustaining capital expenditures   3,904     14,487  
  Gibraltar capital projects   469     1,394  
  Cariboo acquisition (Note 3a)   -     126,194  
  Fair value reclass adjustment on deemed disposition (Note 3b)   -     (13,342 )
  Florence Copper development costs   77,581     132,528  
  Yellowhead development costs   387     553  
  Aley development costs   243     480  
Other items:            
  Right of use assets   194     733  
  Rehabilitation costs asset   26     1,045  
  Disposals   (4 )   (299 )
  Foreign exchange translation and other   4,516     13,868  
  Depletion and amortization   (17,552 )   (35,322 )
  Net book value as at June 30, 2024   1,554,850     1,554,850  


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

12. PROPERTY, PLANT & EQUIPMENT (CONTINUED)

 
Net book value
  Gibraltar Mine     Florence Copper     Yellowhead     Aley     Other     Total  
As at December 31, 2023   805,508     441,107     22,826     15,884     676     1,286,001  
Cariboo acquisition (Note 3a)   126,194     -     -     -     -     126,194  
Deemed disposition (Note 3b)   (13,342 )   -     -     -     -     (13,342 )
Net additions   42,586     132,787     553     480     -     176,406  
Changes in rehabilitation cost asset   1,045     -     -     -     -     1,045  
Depletion and amortization   (35,134 )   -     (10 )   -     (178 )   (35,322 )
Foreign exchange translation   -     13,868     -     -     -     13,868  
As at June 30, 2024   926,857     587,762     23,369     16,364     498     1,554,850  

For the three and six months ended June 30, 2024, the Company capitalized development costs of $77,581 and $132,528 for the Florence Copper project, respectively, which includes $5,971 and $8,719 of capitalized borrowing costs (Note 7), respectively.

During the three and six months ended June 30, 2024, non-cash additions to property, plant and equipment of Gibraltar include $1,840 and $4,349, respectively, of depreciation on mining assets related to capitalized stripping.

Since January 1, 2020, development costs for Yellowhead of $7,089 have been capitalized as mineral property, plant and equipment. Depreciation related to the right of use assets for the three and six months ended June 30, 2024 was $2,854 (2023 - $2,770) and $5,688 (2023 - $5,019), respectively.

13. DEBT

    June 30,     December 31,  
    2024     2023  
Current:            
  Lease liabilities (d)   8,846     11,040  
  Gibraltar equipment loans (e)   13,654     11,105  
  Florence equipment facility (f)   6,024     5,513  
    28,524     27,658  
Long-term:            
  Senior secured notes (a)   684,000     529,880  
  Revolving credit facility (b)   -     26,494  
  Lease liabilities (d)   5,918     6,929  
  Gibraltar equipment loans (e)   24,835     26,887  
  Florence equipment facility (f)   24,647     26,851  
    739,400     617,041  
Deferred financing fees   (14,130 )   (6,808 )
Total debt   753,794     637,891  


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

13. DEBT (CONTINUED)

(a) Senior secured notes

On April 23, 2024, the Company completed an offering of US$500 million aggregate principal amount of senior secured notes (the "2030 Notes"). The 2030 Notes mature on May 15, 2030 and bear interest at an annual rate of 8.25%, payable semi-annually on May 1 and November 1. Majority of the proceeds were used to redeem the outstanding US$400 million 7% senior secured notes due on February 15, 2026 ("2026 Notes"). The remaining proceeds, net of transaction costs, call premium and accrued interest, of approximately $110 million (US$81 million) were available for capital expenditures, including for Florence Copper and Gibraltar, working capital and for general corporate purposes.

The 2030 Notes are secured by liens on the shares of Taseko's wholly-owned subsidiary, Gibraltar Mines Ltd., and the subsidiary's rights under the joint venture agreement relating to Gibraltar, as well as the shares of Curis Holdings (Canada) Ltd., Florence Holdings Inc. ("Florence Holdings") and Cariboo. The 2030 Notes are guaranteed by each of Taseko's existing and future restricted subsidiaries.

The liens on the collateral securing the notes and the guarantees will be first lien, junior in priority to the corresponding liens of the revolving credit facility. The Company is also subject to certain restrictions on asset sales, issuance of preferred stock, dividends and other restricted payments. However, there are no maintenance covenants with respect to the Company's financial performance.

The Company may redeem some or all of the 2030 Notes at any time on or after November 1, 2026, at redemption prices ranging from 104.125% to 100%, plus accrued and unpaid interest to the date of redemption. Prior to November 1, 2026, all or part of the notes may be redeemed at 100%, plus a make-whole premium, plus accrued and unpaid interest to the date of redemption. Until November 1, 2026, the Company may redeem up to 10% of the aggregate principal amount of the notes, at a redemption price of 103%, plus accrued and unpaid interest to the date of redemption. In addition, until November 1, 2026, the Company may redeem up to 40% of the aggregate principal amount of the notes, in an amount not greater than the net proceeds of certain equity offerings, at a redemption price of 108.250%, plus accrued and unpaid interest to the date of redemption. On a change of control, the 2030 Notes are redeemable at the option of the holder at a price of 101%.

The settlement of the 2026 Notes resulted in finance expenses as further described in Note 7.

(b) Revolving credit facility

The company has in place a secured US$80 million revolving credit facility (the "Facility"). The Facility is secured by first liens against Taseko's rights under the Gibraltar joint venture, as well as the shares of Gibraltar Mines Ltd., Curis Holdings (Canada) Ltd., Florence Holdings and Cariboo. The Facility will be available for capital expenditures, working capital and general corporate purposes. The maturity date of the Facility is July 2, 2026

Amounts outstanding under the facility bear interest at the Adjusted Term SOFR rate plus an applicable margin and have a standby fee of 1.00%. As at June 30, 2024, no amount was advanced under the Facility (December 2023 - US$20 million).


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

13. DEBT (CONTINUED)

(b) Revolving credit facility (continued)

The Facility has customary covenants for a revolving credit facility. Financial covenants include a requirement for the Company to maintain a leverage ratio, an interest coverage ratio, a minimum tangible net worth and a minimum liquidity amount as defined under the Facility. The Company was in compliance with these covenants as at June 30, 2024.

(c) Letter of credit facilities

The Gibraltar joint venture has in place a $7 million credit facility for the purpose of providing letters of credit ("LC") to key suppliers of Gibraltar to assist with ongoing trade finance and working capital needs. Any LCs issued under the facility will be guaranteed by Export Development Canada ("EDC") under its Account Performance Security Guarantee program. The facility is renewable annually, is unsecured and contains no financial covenants.

As at June 30 2024, a total of $3.75 million in LCs were issued and outstanding under this LC facility (December 31, 2023 - $3.75 million).

The Company also has a US$4 million credit facility for the sole purpose of issuing LCs to certain key contractors in conjunction with the development of Florence Copper. Any LCs to be issued under this facility will also be guaranteed by EDC. The facility is renewable annually, is unsecured and contains no financial covenants. As at June 30, 2024, there were no LCs issued and outstanding under this LC facility.

(d) Lease liabilities

Lease liabilities include the Company's outstanding lease liabilities under IFRS 16. The lease liabilities have monthly repayment terms ranging between 12 and 84 months.

(e) Gibraltar equipment loans

The equipment loans at June 30, 2024 are secured by most of the existing mobile mining equipment at Gibraltar and commenced between December 2022 and June 2023 with monthly repayment terms of 48 months and with interest rates ranging between 8.9% to 9.4%.

On June 20, 2023, the Company entered into an equipment financing agreement for the amount of US$9.6 million with monthly repayment terms of 48 months and the loan bears interest at the rate of 9.4%.

(f) Florence equipment facility

In the fourth quarter of 2023, the Company entered into a Florence project equipment debt facility with Bank of America secured against specific to equipment for total proceeds of US$25 million. The facility contains no financial covenants and has monthly payments over a term of 60 months. The equipment facility bears interest at a blended rate of 9.3%.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

13. DEBT (CONTINUED)

(g) Debt continuity

The following schedule shows the continuity of long-term debt for the six months ended June 30, 2024:

Total debt as at January 1, 2024   637,891  
Settlement of 2026 Notes   (546,920 )
Write-off of deferred financing charges   4,646  
Issuance of 2030 Notes   683,650  
Deferred financing charges   (13,231 )
Revolving credit facility repayment   (26,494 )
Lease and loan additions   2,094  
Lease liabilities and equipment loans repayments   (15,929 )
Lease and equipment loans from Cariboo acquisition (Note 3a)   7,143  
Unrealized foreign exchange loss   19,900  
Amortization of deferred financing charges (Note 7)   1,044  
Total debt as at June 30, 2024   753,794  

14. FLORENCE ROYALTY OBLIGATION

On January 15, 2024, Florence Holdings, an indirect wholly-owned subsidiary of Taseko, entered into agreements with Taurus Mining Royalty Fund L.P. ("Taurus"), pursuant to which Florence Holdings received US$50 million from Taurus in exchange for a perpetual gross revenue royalty interest in certain real property, mining and other rights held by Florence. The basic royalty rate is 1.95% of the gross revenue from the sale of all copper from Florence Copper for the life of the mine. If project completion of Florence Copper, as defined under the agreements is reached after July 31, 2025, the royalty rate increases to 2.05%. Proceeds from the royalty transaction were contributed to Florence Copper and are available to Florence Copper to fund the construction and development of the commercial production facility. The royalty constitutes a customary lien and encumbrance on Florence's mineral and property rights, is registered as an interest in the Florence Copper mine and is unsecured.

Under the purchase agreement with Florence Holdings, Taurus has a put right to transfer the royalty back to Florence Holdings upon the occurrence of certain circumstances, including certain breaches of the transaction document or if project completion of Florence Copper has not occurred by a long stop completion date of January 31, 2027. If Taurus exercises such put right, Florence Holdings shall pay to Taurus an amount based on the net present value of the royalty or, if the put right is exercised due to project completion being delayed beyond the long stop completion date, the original purchase price paid by Taurus. As part of the transaction, Taseko, Curis Holdings (Canada) Ltd. and Florence Holdings provided to Taurus an unsecured guarantee of the obligations of Florence Copper.

For accounting purposes, the purchase agreement with Taurus is accounted for as a financial instrument and is recorded as a financial liability at amortized cost. The Company has identified embedded derivatives which as of June 30, 2024 had no estimated value. For the three and six months ended June 30, 2024, the Company recorded an accretion on the royalty obligation of $2,132 and $5,548, respectively, in the statement of comprehensive income (loss).


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

14. FLORENCE ROYALTY OBLIGATION (CONTINUED)

Proceeds from Florence royalty obligation   67,695  
Deferred financing fees   (1,477 )
Accretion and fair value adjustment on Florence royalty obligation (Note 7)   5,548  
Unrealized foreign exchange loss   728  
Florence royalty obligation as at June 30, 2024   72,494  

15. DEFERRED REVENUE

    June 30,     December 31,  
    2024     2023  
Current:            
  Customer advance payments (a)   3,547     3,096  
  Osisko - silver stream agreement (b)   6,857     7,250  
Current portion of deferred revenue   10,404     10,346  
Long-term portion of deferred revenue (b)   60,451     59,720  
Total deferred revenue   70,855     70,066  

(a) Customer advance payments

As at June 30, 2024, the Company received advance payments from a customer on 0.7 million pounds (100% basis) of copper concentrate inventory (December 31, 2023 - 0.8 million pounds).

(b) Silver stream purchase and sale agreement

The Company has entered into a silver stream purchase and sale agreement with Osisko Gold Royalties Ltd. ("Osisko"), whereby the Company received upfront cash deposit payments totalling $52.7 million for the sale of an equivalent amount of its 75% share of Gibraltar payable silver production until 5.9 million ounces of silver have been delivered to Osisko. After that threshold has been met, 35% of an equivalent amount of Taseko's share of all future payable silver production from Gibraltar will be delivered to Osisko. The Company receives no further cash consideration once silver deliveries are made under the agreement.

On June 28, 2023, the Company entered into an amendment to its silver stream with Osisko and received $13,586 for the sale of an equivalent amount of its 87.5% share of Gibraltar payable silver production until 6,254,500 ounces of silver have been delivered to Osisko. After that threshold has been met, 30.625% of an equivalent amount of Taseko's share of all future payable silver production from Gibraltar will be delivered to Osisko. The amendment is accounted for as a contract modification under IFRS 15 Revenue from Contracts with Customers. The funds received are available for general working capital purposes.

The Company has recorded the deposits from Osisko as deferred revenue and recognizes amounts in revenue as silver is delivered. The amortization of deferred revenue is calculated on a per unit basis using the estimated total number of silver ounces expected to be delivered to Osisko over the life of Gibraltar. The current portion of deferred revenue is an estimate based on deliveries anticipated over the next twelve months.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

15. DEFERRED REVENUE (CONTINUED)

The following table summarizes changes in the Osisko deferred revenue:

Balance as at December 31, 2023   66,970  
Finance expense (Note 7)   3,177  
Amortization of deferred revenue   (2,839 )
Balance as at June 30, 2024   67,308  

16. EQUITY

(a) Share capital

    Common shares
(thousands)
 
Common shares outstanding as at December 31, 2023   290,000  
  Exercise of share options   2,379  
Common shares outstanding as at June 30, 2024   292,379  

The Company's authorized share capital consists of an unlimited number of common shares with no par value.

(b) Share-based compensation

      Options
(thousands)
    Average
price
 
Outstanding as at January 1, 2024   8,799     1.85  
  Granted   2,956     1.86  
  Exercised   (2,379 )   1.30  
  Cancelled/forfeited   (35 )   1.95  
  Expired   (50 )   0.91  
Outstanding as at June 30, 2024   9,291     2.00  
Exercisable as at June 30, 2024   6,419     1.99  

During the six months period ended June 30, 2024, the Company granted 2,956,000 (2023 - 2,683,000), share options to directors, executives and employees, exercisable at an average exercise price of $1.86 per common share (2023 - $2.37 per common share), over a five year period. The total fair value of options granted was $3,104 (2023 - $3,649) based on a weighted average grant-date fair value of $1.05 (2023 - $1.36) per option.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

16. EQUITY (CONTINUED)

(b) Share-based compensation (continued)

The fair value of options was measured at the grant date using the Black-Scholes formula. Expected volatility is estimated by considering historic average share price volatility. The inputs used in the Black-Scholes formula are as follows:

Expected term (years)   5.0  
Forfeiture rate   0%  
Volatility   64%  
Dividend yield   0%  
Risk-free interest rate   3.5%  
Weighted-average fair value per option $ 1.05  

Deferred, Performance and Restricted Share Units

    RSUs
(thousands)
    DSUs
(thousands)
    PSUs
(thousands)
 
Outstanding as at January 1, 2024   380     2,301     1,955  
  Granted   500     304     880  
  Cancelled   (20 )   -     -  
  Settled   -     -     (530 )
Outstanding as at June 30, 2024   860     2,605     2,305  

During the six months ended June 30, 2024, 303,750 DSUs were issued to directors (2023 - 342,750) and 880,000 PSUs to senior executives (2023 - 830,000). The fair value of DSUs and PSUs granted was $3,067 (2023 - $4,344), with a weighted average fair value at the grant date of $1.83 per unit for the DSUs (2023 - $2.38 per unit) and $2.87 per unit for the PSUs (2023 - $4.25 per unit).

During the six months ended June 30, 2024, the Company granted 500,000 units, with a weighted average fair value at grant date of $2.38 per unit for the RSUs.

Share-based compensation expense is comprised as follows:

 
 
  Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Share options - amortization    565     580     2,103     2,298  
Performance share units - amortization   679     544     1,357     1,089  
Restricted share units - amortization   143     75     294     144  
Change in fair value of deferred share units    1,198     (782 )   4,498     495  
    2,585     417     8,252     4,026  


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

17. EARNINGS (LOSS) PER SHARE

Earnings (loss) per share, calculated on a basic and diluted basis, is as follows:

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Net (loss) income attributable to common shareholders - basic and diluted   (10,953 )   9,991     7,943     43,779  
(in thousands of common shares)                        
Weighted-average number of common shares   291,832     288,519     291,148     288,266  
Effect of dilutive securities:                        
  Stock options   -     2,593     2,292     2,815  
Weighted-average number of diluted common shares   291,832     291,112     293,440     291,081  
(Loss) earnings per common share                        
  Basic (loss) earnings per share   (0.04 )   0.03     0.03     0.15  
  Diluted (loss) earnings per share   (0.04 )   0.02     0.03     0.14  

18. COMMITMENTS AND CONTINGENCIES

The Company is a party to certain contracts relating to service and supply agreements. Future minimum payments under these agreements as at June 30, 2024 are presented in the following table:

Remainder of 2024   6,335  
2025   7,729  
2026   1,463  
2027   -  
2028   -  
2029 and thereafter   -  
Total commitments   15,527  

As at June 30, 2024, the Company had minimum commitments for capital expenditures of $43,993 (December 31, 2023 - $6,150) for Florence Copper and $11,656 (December 31, 2023 - $13,236) for Gibraltar.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

19. SUPPLEMENTARY CASH FLOW INFORMATION

    Three months ended
June 30,
    Six months ended
June 30,
 
    2024     2023     2024     2023  
Change in other non-cash working capital items:                        
  Accounts receivable   6,901     10,281     8,693     8,735  
  Inventories   (3,985 )   (3,711 )   4,690     (9,323 )
  Prepaids   (3,766 )   (3,404 )   (1,499 )   (2,732 )
  Accounts payable and accrued liabilities1   45     (4,108 )   (1,894 )   (5,198 )
  Advance payment on product sales   1,521     (1,342 )   452     (916 )
  Interest payable   24     (224 )   -     (354 )
  Mineral tax payable   36     (197 )   53     (1,382 )
    776     (2,705 )   10,495     (11,170 )
Non-cash investing and financing activities                        
  Cariboo acquisition, net assets (Notes 3a and 3b)   -     -     61,232     65,930  
  Assets acquired under capital lease   1,272     799     1,320     868  
  Right-of-use assets    992     4,441     1,530     10,400  

1. Excludes accounts payable and accrued liability changes on capital expenditures.

20. FAIR VALUE MEASUREMENTS

between market participants at the measurement date. The fair value hierarchy establishes three levels to classify the inputs to valuation techniques used to measure fair value, by reference to the reliability of the inputs used to estimate the fair values.

Level 1 - quoted prices (unadjusted) in active markets for identical assets or liabilities;

Level 2 - inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly (i.e., as prices) or indirectly (i.e., derived from prices); and

Level 3 - inputs for the asset or liability that are not based on observable market data (unobservable inputs).

The fair values of the senior secured notes are $700,163 and the carrying value is $684,000 as at June 30, 2024. The fair value of all other financial assets and liabilities approximates their carrying value.

The Company has certain financial assets and liabilities that are measured at fair value on a recurring basis and uses the fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value, with Level 1 inputs having the highest priority.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

20. FAIR VALUE MEASUREMENTS (CONTINUED)

    Level 1     Level 2     Level 3     Total  
June 30, 2024                        
Financial liabilities designated as FVPL                        
  Derivative liability copper put and call options   -     2,435     -     2,435  
  Performance payments payable   -     -     28,394     28,394  
  Florence copper stream   -     -     31,098     31,098  
    -     2,435     59,492     61,927  
Financial assets designated as FVOCI                        
  Marketable securities   1,044     -     -     1,044  
  Investment in private companies   -     -     1,200     1,200  
  Reclamation deposits   459     -     -     459  
    1,503     -     1,200     2,703  
December 31, 2023                        
Financial assets and liabilities designated as FVPL                        
  Derivative asset copper put and call options   -     3,724     -     3,724  
  Performance payments payable   -     -     25,850     25,850  
    -     3,724     25,850     29,574  
Financial assets designated as FVOCI                        
  Marketable securities   1,333     -     -     1,333  
  Investment in private companies   -     -     1,200     1,200  
  Reclamation deposits   6,696     -     -     6,696  
    8,029     -     1,200     9,229  

There have been no transfers between fair value levels during the reporting period. The carrying value of cash and equivalents, accounts receivable, accounts payable and accrued liabilities approximate their fair value as at June 30, 2024.

The fair value of the senior secured notes, a Level 1 instrument, is determined based upon publicly available information.

The Company's metal concentrate sales contracts are subject to provisional pricing with the selling price adjusted at the end of the quotational period. At each reporting date, the Company's settlement receivable on these contracts are marked-to-market based on a quoted forward price for which there exists an active commodity market. At June 30, 2024, the Company had net settlement receivable of $2,709 (December 31, 2023 - settlement receivable of $7,406)

The estimated performance payments payable, a Level 3 instrument, was estimated based on forecasted copper prices and sales volumes over the next 4 and 10 year periods. The total estimated performance payments payable was then discounted to determine its fair value.

The investment in private companies, a Level 3 instrument, are valued based on a management estimate. As this is an investment in a private exploration and development company, there are no observable market data inputs.


TASEKO MINES LIMITED

Notes to Condensed Consolidated Interim Financial Statements

(Cdn$ in thousands - Unaudited)

20. FAIR VALUE MEASUREMENTS (CONTINUED)

As at June 30, 2024, the determination of the estimated fair value of the investment includes comparison to the market capitalization of comparable public companies.

Commodity price risk

The Company is exposed to the risk of fluctuations in prevailing market commodity prices on the metals it produces.  The Company enters into copper put and collar option contracts to reduce the risk of short-term copper price volatility. The amount and duration of the hedge position is based on an assessment of business-specific risk elements combined with the copper pricing outlook. Copper put and collar option contracts are typically extended adding incremental quarters at established put strike prices to provide the necessary price protection. 

Provisional pricing mechanisms embedded within the Company's sales arrangements have the character of a commodity derivative and are carried at fair value as part of accounts receivable.

The table below summarizes the impact on revenue and receivables for changes in commodity prices on the provisionally invoiced sales volumes.

    As at June 30, 2024  
Copper increase/decrease by US$0.10/lb.1   346  

1 The analysis is based on the assumption that the period end copper price increases/decreases US$0.10 per pound, with all other variables held constant. At June 30, 2024, 2.5 million pounds of copper in concentrate were exposed to copper price movements. The closing exchange rate at June 30, 2024 of CAD/USD 1.37 was used in the analysis.

The sensitivities in the above tables have been determined with foreign currency exchange rates held constant.  The relationship between commodity prices and foreign currencies is complex and movements in foreign exchange can impact commodity prices. The sensitivities should therefore be used with care.


Taseko Mines Limited: Exhibit 99.2 - Filed by newsfilecorp.com

TASEKO MINES LIMITED

Management's Discussion and Analysis

 

This management discussion and analysis ("MD&A") is intended to help the reader understand Taseko Mines Limited ("Taseko", "we", "our" or the "Company"), our operations, financial performance, and current and future business environment. This MD&A is intended to supplement and complement the consolidated financial statements and notes thereto, prepared in accordance with International Financial Reporting Standards ("IFRS") issued by the International Accounting Standards Board for the three and six months ended June 30, 2024 (the "Financial Statements"). You are encouraged to review the Financial Statements in conjunction with your review of this MD&A and the Company's other public filings, which are available on the Canadian Securities Administrators' website at www.sedarplus.com and on the EDGAR section of the United States Securities and Exchange Commission's ("SEC") website at www.sec.gov.

This MD&A is prepared as of July 31, 2024. All dollar figures stated herein are expressed in Canadian dollars, unless otherwise specified. Included throughout this MD&A are references to non-GAAP performance measures which are denoted with an asterisk and further explanation including their calculations are provided on page 27.

Cautionary Statement on Forward-Looking Information

This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities, and events or developments that the Company expects are forward-looking statements. Although we believe the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, global economic events arising from the coronavirus (COVID-19) pandemic outbreak, exploitation and exploration successes, continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. All of the forward-looking statements made in this MD&A are qualified by these cautionary statements. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable law. Further information concerning risks and uncertainties associated with these forward-looking statements and our business may be found in the Company's other public filings with the SEC and Canadian provincial securities regulatory authorities.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Contents

Overview 3
   
Highlights 3
   
Review of Operations 5
   
Operations Analysis 6
   
Gibraltar Outlook 7
   
Florence Copper 8
   
Long-term Growth Strategy 9
   
Annual General Meeting 10
   
Annual Sustainability Report 10
   
Market Review 11
   
Financial Performance 12
   
Financial Condition Review 19
   
Summary of Quarterly Results 24
   
Critical Accounting Policies and Estimates 24
   
Internal and Disclosure Controls Over Financial Reporting 25
   
Key Management Personnel 26
   
Non-GAAP Performance Measures 27
   
Technical Information 33


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Overview

Taseko is a copper focused mining company that seeks to create long-term shareholder value by acquiring, developing, and operating large tonnage mineral deposits in stable jurisdictions which are capable of supporting a mine for decades. The Company's principal assets are the 100% owned Gibraltar mine ("Gibraltar"), which is located in central British Columbia and is one of the largest copper mines in North America and the Florence Copper project, which is under construction. Taseko also owns the Yellowhead copper, New Prosperity gold-copper, and Aley niobium projects.

Highlights

Operating Data (Gibraltar - 100% basis)   Three months ended June 30,     Six months ended June 30,  
    2024     2023     Change     2024     2023     Change  
Tons mined (millions)   18.4     23.4     (5.0 )   41.2     47.5     (6.3 )
Tons milled (millions)   5.7     7.2     (1.5 )   13.4     14.3     (0.9 )
Production (million pounds Cu)   20.2     28.2     (8.0 )   49.9     53.1     (3.2 )
Sales (million pounds Cu)   22.6     26.1     (3.5 )   54.3     52.7     1.6  
                                     

Financial Data   Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands, except for per share amounts)   2024     2023     Change     2024     2023     Change  
Revenues   137,730     111,924     25,806     284,677     227,443     57,234  
Cash flows provided by operations   34,711     33,269     1,442     94,285     61,268     33,017  
Net (loss) income (GAAP)   (10,953 )   9,991     (20,944 )   7,943     43,779     (35,836 )
Per share - basic ("EPS")   (0.04 )   0.03     (0.07 )   0.03     0.15     (0.12 )
Earnings from mining operations before depletion, amortization and non-recurring items*   76,928     27,664     49,264     129,725     68,803     60,922  
Adjusted EBITDA*   70,777     22,218     48,559     120,700     58,277     62,423  
Adjusted net income (loss)*   30,503     (4,376 )   34,879     38,231     712     37,519  
Per share - basic ("adjusted EPS")*   0.10     (0.02 )   0.12     0.13     -     0.13  

Effective as of March 25, 2024 the Company increased its ownership in Gibraltar from 87.5% to 100%.  As a result, the financial results reported in this MD&A include 100% of Gibraltar income and expenses for the period March 25, 2024 to June 30, 2024 (87.5% for the period March 16, 2023 to March 24, 2024, and 75% prior to March 15, 2023).  For more information on the Company's acquisition of Cariboo, please refer to the Financial Statements - Note 3.

The Company finalized the accounting for the acquisition of its initial 50% interest in Cariboo from Sojitz and the related 12.5% interest in Gibraltar in the fourth quarter of 2023.  In accordance with the accounting standards for business combinations, the comparable financial statements as of June 30, 2023 and for the three and six months then ended have been revised to reflect the changes in finalizing the consideration paid and the allocation of the purchase price to the assets and liabilities acquired.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Second Quarter Review


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Review of Operations

Gibraltar mine

Operating data (100% basis)   Q2 2024     Q1 2024     Q4 2023     Q3 2023     Q2 2023  
Tons mined (millions)   18.4     22.8     24.1     16.5     23.4  
Tons milled (millions)   5.7     7.7     7.6     8.0     7.2  
Strip ratio   1.6     1.7     1.5     0.4     1.5  
Site operating cost per ton milled (Cdn$)* $ 13.93   $ 11.73   $ 9.72   $ 12.39   $ 13.17  
Copper concentrate                              
Head grade (%)   0.23     0.24     0.27     0.26     0.24  
Copper recovery (%)   77.7     79.0     82.2     85.0     81.9  
Production (million pounds Cu)   20.2     29.7     34.2     35.4     28.2  
Sales (million pounds Cu)   22.6     31.7     35.9     32.1     26.1  
Inventory (million pounds Cu)   2.3     4.9     6.9     8.8     5.6  
Molybdenum concentrate                              
Production (thousand pounds Mo)   185     247     369     369     230  
Sales (thousand pounds Mo)   221     258     364     370     231  
Per unit data (US$ per pound produced)*                              
Site operating costs* $ 2.88   $ 2.21   $ 1.59   $ 2.10   $ 2.43  
By-product credits*   (0.26 )   (0.17 )   (0.13 )   (0.23 )   (0.13 )
Site operating costs, net of by-product credits* $ 2.62   $ 2.04   $ 1.46   $ 1.87   $ 2.30  
Off-property costs   0.37     0.42     0.45     0.33     0.36  
Total operating costs (C1)* $ 2.99   $ 2.46   $ 1.91   $ 2.20   $ 2.66  


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Operations Analysis

Second Quarter Review

Gibraltar produced 20.2 million pounds of copper for the quarter. Copper production and mill throughput in the quarter were impacted by a strike in June 2024 and planned downtime in Concentrator #1 for the relocation of the in-pit crusher and other concurrent maintenance.

On June 1, 2024, operations at the mine were suspended for 18 days due to strike action by Gibraltar's unionized workforce strike. During this period all mining and milling operations were shut down and only essential staff remained on site to operate and maintain critical systems. Operations resumed on June 19, after the ratification of a new agreement by union members.

Copper head grades of 0.23% were in line with management expectations and the mine plan. Copper recoveries in the second quarter were 78%, lower than the recent quarters due to increased milling of partially oxidized ore from the Connector pit and variable mill operating conditions during the strike and maintenance activities.

A total of 18.4 million tons were mined in the second quarter, lower than previous quarters due to the labour disruption. Stripping continued in the Connector pit and ore release will transition from the Gibraltar pit to the Connector pit in the coming months. A total of 1.5 million tons of oxide ore from the upper benches of the Connector pit were also added to the heap leach pads in the period.

Total site costs* at Gibraltar of $90.5 million (which includes capitalized stripping of $10.7 million) was lower compared to the previous quarter due to the strike in June. A total of $2.5 million care and maintenance costs were incurred during the strike which are not included in total site costs or cost of sales.

During the six months ended June 30, 2024, the Company incurred total costs of $9.7 million in relation to the primary crusher relocation project for Concentrator #1. Direct costs for the physical move of the crusher of $7.9 million have been included in the statement of income (loss). 

Molybdenum production was 185 thousand pounds in the second quarter and production was impacted by mill availability. At an average molybdenum price of US$21.79 per pound, molybdenum generated a by-product credit per pound of copper produced of US$0.26 in the second quarter.

Off-property costs per pound produced* were US$0.37 for the second quarter and also reflected higher copper sales volumes relative to production volumes compared to the prior quarter.

Total operating costs per pound produced (C1)* was US$2.99 for the quarter, compared to US$2.66 in the prior year quarter as shown in the bridge graph below with the difference substantially attributed to the lower copper production in the quarter:


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Gibraltar Outlook 

With the major project and maintenance work in both concentrators now completed, production in the second half of 2024 is expected to be stronger than the first half of 2024. An updated mine plan and mill throughput opportunities are being evaluated to recover some of the production that was lost during the strike.  Copper production for the year is expected to be in the range of 110 to 115 million pounds, compared to original guidance of approximately 115 million pounds.

The Gibraltar pit continued to be the main source of mill feed in the second quarter and mining of ore is now transitioning into the Connector pit, which will be the primary source of mill feed in the second half of the year.  Additional oxide ore from Connector pit is expected to be added to the heap leach pads this year.  Refurbishment of Gibraltar's SX/EW plant, which has been idle since 2015, will begin later this year and management is planning to restart the facility in 2025.

In the quarter, the Company has tendered Gibraltar concentrate to various customers for the remainder of 2024 and for significant tonnages in 2025 and 2026. In 2023, Treatment and Refining Costs (“TCRCs”) accounted for approximately US$0.17 per pound of off-property costs. With these recently awarded offtake contracts, the Company expects off-property costs to reduce to US$0.05 per pound or less over the next two and half years due to these fixed, lower TCRCs on the sale of its copper concentrate.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

The Company has a prudent hedging program in place to protect a minimum copper price during the Florence construction period.  Currently, the Company has copper collar contracts that secure a minimum copper price of US$3.75 per pound for 42 million pounds of copper covering the second half of 2024, and copper collar contracts that secure a minimum copper price of US$4.00 per pound for 108 million pounds of copper for 2025.  The copper collar contracts also have ceiling prices between US$5.00 and US$5.40 per pound (refer to the section "Hedging Strategy" for details).

Florence Copper

The Company has all the key permits in place for the commercial production facility at Florence Copper and construction has commenced.  All the major SX/EW plant components are on site and previous work on detailed engineering and procurement of long-lead items has de-risked the construction schedule.  First copper production is expected in the fourth quarter of 2025.

The Company has a technical report entitled "NI 43-101 Technical Report Florence Copper Project, Pinal County, Arizona" dated March 30, 2023 (the "2023 Technical Report") on SEDAR+. The 2023 Technical Report was prepared in accordance with NI 43-101 and incorporated the results of testwork from the Production Test Facility ("PTF") as well as updated capital and operating costs (Q3 2022 basis) for the commercial production facility.

Project highlights based on the 2023 Technical Report:

Construction activities in the second quarter of 2024 have focused on wellfield drilling, site preparations and earthworks for the commercial wellfield and plant area including the excavation of process ponds and concrete foundation work for the plant, and the hiring of additional personnel for the construction and operations teams.

Drilling of the commercial facility wellfield commenced in February and two drills operated during the second quarter, with a third drill mobilized in July.  As of the end of June, a total of 18 production wells had been drilled which is in line with the planned construction schedule.

The Company has a fixed-price contract with the general contractor for construction of the SX/EW plant and associated surface infrastructure.

Florence Copper Quarterly Capital Spend

    Three months ended     Six months ended  
(US$ in thousands)   June 30, 2024     June 30, 2024  
Site and PTF operations   4,314     8,559  
Commercial facility construction costs   36,850     54,848  
Other capital costs   7,053     22,762  
Total Florence project expenditures   48,217     86,169  


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

The estimated remaining capital costs in the 2023 Technical Report for construction of the commercial facility was US$232 million, of which US$36.9 million has been incurred in the second quarter of 2024 and US$54.8 million has been incurred for the six months ended June 30, 2024.  Other capital costs of US$22.8 million include final payments for delivery of long-lead equipment that was ordered in 2022, and to bring forward the construction of an evaporation pond to provide additional water management flexibility. 

The Company has closed several Florence project level financings to fund initial commercial facility construction costs. On April 26th, the Company received the second deposit of US$10 million from the US$50 million copper stream transaction with Mitsui & Co. (U.S.A.) Inc. ("Mitsui"). The third deposit was received in July and the remaining amounts of US$20 million should be received in October 2024 and January 2025.

The Company considers that the construction of Florence Copper is now fully funded, and remaining project costs are expected to be funded with the Company's available liquidity, remaining instalments from Mitsui, and cashflow from its 100% ownership interest in Gibraltar.  The Company also has in place an undrawn revolving credit facility for US$80 million.

Long-term Growth Strategy 

Taseko's strategy has been to grow the Company by acquiring and developing a pipeline of projects focused on copper in North America. We continue to believe this will generate long-term returns for shareholders. Our other development projects are located in British Columbia, Canada.

Yellowhead Copper Project

Yellowhead Mining Inc. ("Yellowhead") has an 817 million tonnes reserve and a 25-year mine life with a pre-tax net present value of $1.3 billion at an 8% discount rate using a US$3.10 per pound copper price based on the Company's 2020 NI 43-101 technical report. Capital costs of the project were estimated at $1.3 billion over a 2-year construction period. During the first 5 years of operation, the copper equivalent grade will average 0.35% producing an average of 200 million pounds of copper per year at an average C1* cost, net of by-product credit, of US$1.67 per pound of copper produced. The Yellowhead copper project contains valuable precious metal by-products with 440,000 ounces of gold and 19 million ounces of silver production over the life of mine.

The Company is preparing to advance into the environmental assessment process and has recently opened a project office to support ongoing engagement with local communities including First Nations. The Company is also conducting a site investigation field program this year, and collecting baseline data and modeling which will be used to support the environmental assessment and permitting of the project.

New Prosperity Gold-Copper Project

In late 2019, the Tŝilhqot'in Nation, as represented by Tŝilhqot'in National Government, and Taseko Mines Limited entered into a confidential dialogue, with the involvement of the Province of British Columbia, seeking a long-term resolution of the conflict regarding Taseko's proposed copper-gold mine previously known as New Prosperity, acknowledging Taseko's commercial interests and the Tŝilhqot'in Nation's opposition to the project.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

This dialogue has been supported by the parties' agreement, beginning December 2019, to a series of standstill agreements on certain outstanding litigation and regulatory matters relating to Taseko's tenures and the area in the vicinity of Teẑtan Biny (Fish Lake).

The dialogue process has made meaningful progress in recent months but is not complete. The Tŝilhqot'in Nation and Taseko acknowledge the constructive nature of discussions, and the opportunity to conclude a long-term and mutually acceptable resolution of the conflict that also makes an important contribution to the goals of reconciliation in Canada.

In March 2024, Tŝilhqot'in and Taseko formally reinstated the standstill agreement for a final term, with the goal of finalizing a resolution before the end of this year.

Aley Niobium Project

Environmental monitoring and product marketing initiatives on the Aley niobium project continue. The converter pilot test is ongoing and is providing additional process data to support the design of the commercial process facilities and will provide final product samples for marketing purposes. The Company has also initiated a scoping study to investigate the potential production of niobium oxide at Aley to supply the growing market for niobium-based batteries.

Annual General Meeting  

The Company’s Annual General Meeting was held on June 13, 2024 and shareholders voted in favor of all items of business before the meeting, including the advisory resolution on executive compensation (Say-on-Pay) and the election of all director nominees. Detailed voting results for the 2024 Annual General Meeting are available on SEDAR+ at www.sedarplus.com.

Annual Sustainability Report

In June 2024, the Company published its annual Sustainability Report, titled H2O + ESG (the "Report"). The Report focuses on the 2023 operational and sustainability performance of Taseko's foundational asset, the Gibraltar copper mine in British Columbia, and highlights social and economic contributions from the Florence Copper project in Arizona, which will soon become the Company's second operating asset.

Taseko's 2023 Sustainability Report features several significant initiatives underway across the Company to conserve and reuse water, and to achieve water management objectives. This includes a pioneering in-situ biological water treatment initiative undertaken at the Gibraltar mine last year - part of a long-term water management program that has achieved a 77% reduction in free water stored in the mine's tailings storage facility over the past decade.

While profitable operations and return on investment are critical drivers for Taseko's success, the Company also delivers value to its employees and operating communities, business partners, Indigenous Nations and governments. The annual Sustainability Report is an opportunity to showcase the important benefits that the Company generates through its operations, investments and people.

The full report can be viewed and downloaded at: tasekomines.com/sustainability/overview/


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Market Review 

Copper Molybdenum   Canadian/US Dollar Exchange

Prices (USD per pound for Commodities)

(Source Data: Bank of Canada, Platts Metals, and London Metals Exchange)

Copper prices are currently around US$4.00 per pound, compared to US$4.30 per pound at June 30, 2024. Copper prices have decreased in recent weeks due to growing warehouse inventories and with concerns over softness in Chinese demand in the near term despite resilience in the US economy.  Tight supply conditions are expected into 2025 due to few available sources of new primary copper supply capacity and growing demand trends primarily for electrification and the energy transition.  Smelter treatment and refining charges remain historically low, with some contracts being concluded at negative (premium) or near zero rates in the second quarter. Such conditions indicate a shortfall of concentrate supply and potential shortages of copper metal could continue which could lead to higher copper prices later in the year and into 2025.

Electrification of transportation and the focus on government investment in construction and infrastructure including initiatives focused on the renewable energy, electrification and meeting net zero targets by 2050, are inherently copper intensive and supports higher copper prices in the longer term. These factors continue to provide unprecedented catalysts for higher copper prices in the future as new mine supply lags growth in copper demand.

Approximately 5% of the Company's revenue is made up of molybdenum sales. During the second quarter of 2024, the average molybdenum price was US$21.79 per pound. Molybdenum prices are currently around US$22.25 per pound. Molybdenum demand and prices have been driven by supply challenges at large South American copper mines that produce molybdenum as a by-product. Continued strong demand from the energy sector has boosted demand for alloyed steel products, as well as growing demand from the renewables and military sectors. The Company's sales agreements specify molybdenum pricing based on the published Platts Metals reports.

Approximately 80% of Gibraltar's costs are Canadian dollar denominated and therefore, fluctuations in the Canadian/US dollar exchange rate can have a significant effect on the Company's financial results.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Financial Performance

Earnings

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   2024     2023     Change     2024     2023     Change  
Net (loss) income   (10,953 )   9,991     (20,944 )   7,943     43,779     (35,836 )
Net unrealized foreign exchange loss (gain)   5,408     (10,966 )   16,374     19,096     (11,916 )   31,012  
Unrealized loss (gain) on derivative instruments   10,033     (6,470 )   16,503     13,552     (4,280 )   17,832  
Other operating costs   10,435     -     10,435     10,435     -     10,435  
Call premium on settlement of debt   9,571     -     9,571     9,571     -     9,571  
Loss on settlement of long-term debt, net of capitalized interest   2,904     -     2,904     2,904     -     2,904  
Gain on Cariboo acquisition   -     -     -     (47,426 )   (46,212 )   (1,214 )
Gain on acquisition of control of Gibraltar**   -     -     -     (14,982 )   -     (14,982 )
Realized gain on sale of inventory***   4,633     -     4,633     17,987     -     17,987  
Realized gain on processing of ore stockpiles****   3,191     -     3,191     3,191     -     3,191  
Accretion on Florence royalty obligation   2,132     -     2,132     5,548     -     5,548  
Accretion and fair value adjustment on consideration payable to Cariboo   8,399     1,451     6,948     9,954     1,451     8,503  
Non-recurring other expenses for Cariboo acquisition   394     263     131     532     263     269  
Estimated tax effect of adjustments   (15,644 )   1,356     (17,000 )   (74 )   17,627     (17,701 )
Adjusted net income (loss)   30,503     (4,375 )   34,878     38,231     712     37,519  

**The $15.0 million gain on acquisition of control of Gibraltar in Q1 2024 relates to the write-up of finished copper concentrate inventory for Taseko's 87.5% share to its fair value at March 25, 2024. 

*** Cost of sales for the three months ended June 30, 2024 included $4.6 million in write-ups to net realizable value for concentrate inventory held at March 25, 2024 that were subsequently sold in April. The realized portion of the gains recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were sold.

**** Cost of sales for the three months ended June 30, 2024 included $3.2 million in write-ups to net realizable value for ore stockpiles held at March 25, 2024 that were subsequently processed in the second quarter. The realized portion of the write-ups recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were processed.

The Company’s net loss was $11.0 million ($0.04 loss per share) for the three months ended June 30, 2024 compared to net income of $10.0 million ($0.03 earnings per share) in the prior year period. The net loss in the current period was primarily due to $9.5 million paid for call premium for retirement of the 2026 Notes and $10.5 million of accretion and fair value adjustments for Cariboo and Florence Copper financing obligations.  The Company also recognized $7.9 million in asset relocation costs for the primary crusher move, $10.0 million of unrealized loss on derivatives, and $5.4 million of unrealized foreign exchange losses, which were offset by the insurance recoverable of $26.3 million for damage to a component in Concentrator #2 in 2023.

The Company's net income was $7.9 million ($0.03 per share) for the six months ended June 30, 2024, compared to net income of $43.8 million ($0.15 earnings per share) for the same prior year period.  The decrease in net income was substantially attributable to unrealized losses on derivatives and foreign exchange in 2024. Earnings in the first half of 2024 were also negatively impacted by mill availability and downtime, costs expensed for the primary crusher physical relocation, and higher finance expenses due to additional net borrowings including Florence Copper project financings. These decreases in earnings were partially offset by increased ownership in Gibraltar from the incremental Cariboo acquisitions, higher average copper prices, lower overall site operating costs, and the insurance recoverable of $26.3 million.


The Company's adjusted net income was $30.5 million ($0.10 per share) for the three months ended June 30, 2024, compared to adjusted net loss of $4.4 million ($0.02 loss per share) for the prior year quarter. The increase in adjusted net income of $34.9 million was primarily due to the insurance recovery recognized in the quarter, higher average LME copper prices and greater ownership interest in Gibraltar, partially offset by higher financing costs from the Company's additional borrowings.

The Company's adjusted net income was $38.2 million ($0.13 per share) for the six months ended June 30, 2024, compared to adjusted net income of $0.7 million ($nil per share) for the prior year period after adjusting for the bargain purchase gains recognized on the Company's incremental acquisition of Cariboo in both years. The increase in adjusted net income of $37.5 million was primarily due to the insurance recovery recognized in the second quarter, higher copper prices and copper sales volumes and greater ownership interest in Gibraltar partially offset by higher financing costs from the Company's additional borrowings.

No adjustments are made to adjusted net income for provisional price adjustments in the three and six months ended June 30, 2024.

Revenues

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   20241     20231     Change     20241     20231     Change  
Copper contained in concentrate   132,580     112,932     19,648     276,886     222,055     54,831  
Copper price adjustments on settlement   627     (1,555 )   2,182     245     (1,757 )   2,002  
Molybdenum concentrate   6,176     5,712     464     12,253     13,461     (1,208 )
Molybdenum price adjustments on settlement   1,400     (1,251 )   2,651     1,926     580     1,346  
Silver   1,393     1,514     (121 )   3,120     3,046     74  
Total gross revenue   142,176     117,352     24,824     294,430     237,385     57,045  
Less: Treatment and refining costs   (4,446 )   (5,428 )   982     (9,753 )   (9,942 )   189  
Revenue   137,730     111,924     25,806     284,677     227,443     57,234  
(thousands of pounds, unless otherwise noted)                                    
Sales of copper in concentrate2   21,708     21,926     (218 )   52,090     41,959     10,131  
Average realized copper price (US$ per pound)   4.49     3.78     0.71     4.15     3.90     0.25  
Average LME copper price (US$ per pound)   4.42     3.84     0.58     4.12     3.95     0.17  
Average exchange rate (Cdn$/US$)   1.37     1.34     0.03     1.36     1.35     0.01  

1 The financial results reported include the Company's 87.5% proportionate share of Gibraltar income and expenses for the period March 16, 2023 to March 24, 2024 (prior to March 15, 2023 - 75%) and 100% of Gibraltar income and expenses for the period March 25, 2024 to June 30, 2024. 

2 This amount includes a net smelter payable deduction of approximately 3.5% to derive net payable pounds of copper sold, 12.5% of Cariboo's share of copper sales for the period March 16, 2023 to March 24, 2024 and 25% since March 25, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Copper revenues for the three months ended June 30, 2024 increased by $19.6 million compared to the same prior period, with $18.6 million due to higher copper prices and $2.1 million due to a weakening Canadian dollar, partially offset by a reduction in copper sales volume due to the downtime from the union strike and mill availability in June 2024.

Copper revenues for the six months ended June 30, 2024 increased by $54.8 million compared to the same prior period, with $40.5 million due to larger sales volumes of 10.1 million pounds, $12.5 million due to higher copper prices and $1.8 million due to the favorable impact of a stronger US dollar in the first half of 2024. The increase in sales volumes reflects the impact from the Cariboo acquisition in March, partially offset by the impact from the union strike in Gibraltar and mill availability in the first half of 2024 due to mill maintenance downtime.

Molybdenum revenues for the three months ended June 30, 2024 increased by $0.5 million compared to the same prior period primarily due to higher average molybdenum prices of US$21.79 per pound, compared to US$21.30 per pound for the prior period, and the impact from the additional ownership interest in Gibraltar. The increase was partially offset by the impact from lower sales volume due to lower mill throughput.

Molybdenum revenues for the six months ended June 30, 2024 decreased by $1.2 million compared to the same prior period due primarily to lower average molybdenum prices of US$20.85 per pound, compared to US$27.23 per pound for the prior period.

Cost of sales and other operating costs

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   20241     20231     Change     20241     20231     Change  
Site operating costs   79,804     83,374     (3,570 )   159,482     157,812     1,670  
Transportation costs   6,408     6,966     (558 )   16,561     12,070     4,491  
Changes in inventories:                                    
  Changes in finished goods   10,462     (3,356 )   13,818     30,854     (2,957 )   33,811  
  Changes in sulphide ore stockpiles   1,161     5,410     (4,249 )   1,178     4,143     (2,965 )
  Changes in oxide ore stockpiles   (2,919 )   (8,134 )   5,215     (5,655 )   (12,428 )   6,773  
Production costs   94,916     84,260     10,656     202,420     158,640     43,780  
Depletion and amortization   13,721     15,594     (1,873 )   28,745     27,621     1,124  
Cost of sales   108,637     99,854     8,783     231,165     186,261     44,904  
Site operating costs per ton milled* $ 13.93   $ 13.17   $ 0.76   $ 12.67   $ 13.34   $ (0.67 )
                                     
Other operating costs:                                    
  Crusher relocation costs   7,911     -     7,911     7,911     -     7,911  
  Site care and maintenance costs   2,524     -     2,524     2,524     -     2,524  
    10,435     -     10,435     10,435     -     10,435  
                                     
  Insurance recovery   (26,290 )   -     (26,290 )   (26,290 )   -     (26,290 )

1The financial results reported include the Company's 87.5% proportionate share of Gibraltar income and expenses for the period March 16, 2023 to March 24, 2024 (prior to March 15, 2023 - 75%) and 100% of Gibraltar income and expenses for the period March 25, 2024 to June 30, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Site operating costs for the three and six months ended June 30, 2024 decreased by $3.6 million and increased by $1.7 million, respectively, compared to the same prior periods. The decrease in the three months period was primarily due to the impact of the union strike at Gibraltar. The increase in the six months period was primarily due to consolidating an additional 12.5% share of Gibraltar's site operating costs.

Transportation costs for the six months ended June 30, 2024 compared to the same prior period increased due to larger sales volumes and increased concentrate trucking movements including to the port.

During the second quarter of 2024, copper in finished goods inventory decreased by 2.6 million pounds, which contributed to an increase in production costs of $10.5 million. Changes in inventories of finished goods for the three months ended June 30, 2024 also included $4.6 million in write-ups to net realizable value for concentrate held at March 25, 2024 that was sold in April.

During the first half of 2024, copper in finished goods inventory decreased by 4.6 million pounds, which contributed to an increase in production costs of $30.9 million after factoring in the write up to fair value on March 25, 2024 for inventory that was sold between March 26 and June 30, 2024.

During the second quarter of 2024, the sulphide ore stockpiles decreased by 0.2 million tons, which contributed to an increase in production costs of $1.2 million. Changes in inventories of sulphide ore stockpiles for the three months ended June 30, 2024 included $3.2 million in write-ups to net realizable value for sulphide ore stockpiles inventory held at March 25, 2024 that was processed in the second quarter.

During the three and six months ended June 30, 2024, the oxide ore stockpiles increased by a 1.5 million and 3.5 million tons of oxide tons, respectively, from the Connector pit that were placed on the heap leach pads, which contributed to a decrease in production costs of $2.9 million and $5.7 million, respectively. In the comparable prior periods, 2.0 million and 2.5 million tons were added to the oxide ore stockpiles, respectively, which contributed to a decrease in production costs in the comparative period of $5.7 million and $12.4 million, respectively.

Depletion and amortization for the three months ended June 30, 2024 decreased by $1.9 million over the same prior period primarily due to lower mill throughput from the impact of the June union strike as certain assets are depreciated on a units of production basis. Depletion and amortization for the six months ended June 30, 2024 increased by $1.1 million over the same prior period primarily due to the impact of proportionately consolidating the additional interest of Gibraltar.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Other expenses (income)

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   2024     2023     Change     2024     2023     Change  
General and administrative   3,517     3,590     (73 )   6,646     6,890     (244 )
Share-based compensation expense   2,512     344     2,168     7,952     3,729     4,223  
Realized loss on derivative instruments   1,655     1,911     (256 )   3,357     3,937     (580 )
Unrealized loss (gain) on derivative instruments   10,033     (6,470 )   16,503     13,552     (4,280 )   17,832  
Project evaluation expenditures   542     212     330     759     537     222  
Gain on Cariboo acquisition   -     -     -     (47,426 )   (46,212 )   (1,214 )
Gain on acquisition of control of Gibraltar   -     -     -     (14,982 )   -     (14,982 )
Other expense (income), net   399     230     169     261     (204 )   465  
    18,658     (183 )   18,841     (29,881 )   (35,603 )   5,722  

General and administrative expenses for the three and six months ended June 30, 2024 are generally consistent with the same prior periods.

Share-based compensation expense is comprised of amortization of share options and performance share units and the expense on deferred and restricted share units. Share-based compensation expense increased for the three and six months ended June 30, 2024, compared to the same periods in 2023, primarily due to increases in the Company's share price during the period and its impact on the valuation of the deferred share units. More information is set out in Note 16b of the Financial Statements.

For the three months ended June 30, 2024, the Company realized a net loss on derivative instruments of $1.7 million primarily due to the expensing of premiums paid for copper collars and fuel options for the period that settled out-of-the-money, compared to a net realized loss of $1.9 million for the prior period.

For the six months ended June 30, 2024, the Company realized a loss on derivative instruments of $3.4 million primarily due to the copper collars covering production for the quarter that settled out-of-the-money, compared to a realized loss of $3.9 million in the first half of 2023.

For the three months ended June 30, 2024, the net unrealized loss on derivative instruments of $10.0 million relates primarily to the change in the fair value of outstanding copper price collars covering the second half of  2024 and the full year of 2025. These hedge positions were out-of-the-money in the quarter due to higher prevailing copper prices. The unrealized loss on derivative instruments of $10.0 million also includes accretion of the derivative liability to Mitsui for $1.2 million. The net unrealized gain on derivatives for the second quarter of 2023 was $6.5 million.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

On March 25, 2024, the Company completed the acquisition of the remaining 50% of Cariboo from Dowa and Furukawa. The Company recognized a bargain purchase gain of $47.4 million on the acquisition for the difference between the fair value of the net assets acquired and the estimated fair value of total consideration payable. On March 15, 2023, the Company acquired 50% of Cariboo from Sojitz which gave the Company an additional 12.5 % effective interest in Gibraltar. The Company recognized a bargain purchase gain of $46.2 million on the acquisition for the difference between the fair value of the net assets acquired and the estimated fair value of total consideration payable. More information on these gains is set out in Note 3 of the Financial Statements.

The gain of $15.0 million on the acquisition of control of Gibraltar reflects the difference in the fair value of the assets acquired and liabilities assumed and their book value immediately before the acquisition. The gain was attributed to the write-up of finished copper concentrate inventory to fair value at March 25, 2024.

Project evaluation expenditures represent costs associated with the New Prosperity project and other technical expenditures undertaken by Taseko.

Finance expenses and income

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   2024     2023     Change     2024     2023     Change  
Interest expense   13,586     11,281     2,305     28,406     22,822     5,584  
Amortization of financing fees   619     717     (98 )   1,359     1,388     (29 )
Finance expense - deferred revenue   1,809     1,492     317     3,177     2,965     212  
Accretion of PER   697     572     125     1,395     1,076     319  
Accretion on Florence royalty obligation   2,132     -     2,132     5,548     -     5,548  
Accretion and fair value adjustment on 
  consideration payable to Cariboo
  8,399     1,451     6,948     9,954     1,451     8,503  
Finance income   (911 )   (757 )   (154 )   (1,997 )   (1,678 )   (319 )
Loss on settlement of long-term debt   4,646     -     4,646     4,646     -     4,646  
Less: interest capitalized   (5,971 )   (2,045 )   (3,926 )   (8,719 )   (3,925 )   (4,794 )
Finance expenses, net   25,006     12,711     12,295     43,769     24,099     19,670  

Interest expense for the three and six months ended June 30, 2024 increased from the prior periods primarily due to the impact of higher interest rates and higher principal on the new senior secured notes, new Florence equipment loans and draws against the revolving credit facility which was partially offset by the capitalization of a portion of borrowing costs attributed to funding of Florence development costs.

Finance expense on deferred revenue adjustments represents the implicit financing component of the upfront deposit from the silver sales streaming arrangement with Osisko Gold Royalties Ltd. ("Osisko"). Accretion and fair value adjustments on the consideration payable to Cariboo were $8.4 million and $10.0 million for the three and six months ended June 30, 2024, respectively. The increase in accretion and fair value adjustments during the second quarter was primarily due to the impact of higher estimated copper prices over the forecast period. Accretion and fair value adjustments on the Florence royalty obligation were $2.1 million and $5.5 million for the three and six months ended June 30, 2024, respectively, accounting for increased forecast copper prices on the royalty to Taurus and advancing towards first production since closing in February 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Finance income for the three and six months ended June 30, 2024 increased from the prior year due to higher interest rates on the Company's cash balances.

Income tax

    Three months ended June 30,     Six months ended June 30,  
(Cdn$ in thousands)   2024     2023     Change     2024     2023     Change  
Current income tax expense   633     215     418     1,438     759     679  
Deferred income tax (recovery) expense   (3,880 )   463     (4,343 )   18,597     20,138     (1,541 )
Income tax (recovery) expense   (3,247 )   678     (3,925 )   20,035     20,897     (862 )
Effective tax rate   22.9%     6.4%     16.5%     71.6%     32.3%     39.3%  
Canadian statutory rate   27.0%     27.0%     -     27.0%     27.0%     -  
B.C. Mineral tax rate   9.5%     9.5%     -     9.5%     9.5%     -  

The overall income tax (recovery) expense for the three and six months ended June 30, 2024 was due to deferred income tax (recovery) expense recognized on income for accounting purposes. The effective tax rate for the first half of 2024 is higher than the combined B.C. mineral and income statutory tax rate due to certain expenses such as finance charges, derivative gains and general and administrative costs that are not deductible for B.C. mineral tax purposes.

As foreign exchange revaluations on the senior secured notes are not recognized for tax purposes until realized, and in the case of capital losses, when they are applied, the effective tax rate may be significantly higher or lower than the statutory rates, as is the case for the three and six months ended June 30, 2024, relative to net income (loss) for those periods.

The current income tax expense represents an estimate of B.C. mineral taxes payable for the three and six months ended June 30, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Financial Condition Review

Balance sheet review

    At June 30,     At December 31,        
(Cdn$ in thousands)   2024     2023     Change  
Cash and equivalents   198,627     96,477     102,150  
Other current assets   181,460     152,978     28,482  
Property, plant and equipment   1,554,850     1,286,001     268,849  
Other assets   42,468     30,912     11,556  
Total assets   1,977,405     1,566,368     411,037  
Current liabilities1   153,526     113,531     39,995  
Debt:                  
  Senior secured notes   671,068     524,491     146,577  
  Equipment related financings   83,777     88,209     (4,432 )
  Credit facility   (1,051 )   25,191     (26,242 )
Deferred revenue   60,451     59,720     731  
Other liabilities   548,165     321,078     227,087  
Total liabilities   1,515,936     1,132,220     383,716  
Equity   461,469     434,148     27,321  
Net debt (debt minus cash and equivalents)   555,167     541,414     13,753  
Total common shares outstanding (millions)   292.4     290.0     2.4  

1 Excludes current portion of long-term debt

The Company's asset base is comprised principally of property, plant and equipment, reflecting the capital intensive nature of its large scale, open pit mining operation at Gibraltar and construction the commercial facility at Florence. Other current assets primarily include accounts receivable, inventories (concentrate inventories, ore stockpiles, and supplies), prepaid expenses, and marketable securities. Concentrate inventories, accounts receivable and cash balances can fluctuate due to sales and cash settlement schedules.

Property, plant and equipment increased by $268.8 million in the six months ended June 30, 2024, which includes the impact from acquiring an additional 12.5% effective interest in Gibraltar from Dowa and Furukawa, $132.5 million for Florence Copper development costs, and capital expenditures at Gibraltar (deferred stripping, sustaining capital and capital projects).

Net debt has increased by $13.8 million in the six months ended June 30, 2024, primarily due to investment in the development of Florence Copper and the increase in debt due to the effect of a weakening Canadian dollar against US dollar net borrowings, offset by increase of cash position which included net proceeds from the new senior secured notes, Mitsui and Taurus financings, and release of restricted cash.

Deferred revenue relates to the advance payments received from Osisko for the sale of Taseko's share of future silver production from Gibraltar and customer advance payments on copper concentrate.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Other liabilities increased by $227.1 million primarily due to the $68.9 million for deferred consideration payable to Dowa and Furukawa for the acquisition of 50% of Cariboo and the $22.7 million additional share of Gibraltar's provision for environmental rehabilitation that the Company assumed with the purchase of Cariboo, $72.5 million of Florence royalty obligation related to the Taurus royalty financing, $31.1 million for the Florence copper stream derivative liability to Mitsui, and an increase in deferred tax liabilities arising primarily from the recent acquisition of 50% of Cariboo.

As at July 31, 2024, there were 293,351,398 common shares and 9,291,366 stock options outstanding. More information on these instruments and the terms of their exercise is set out in Note 16b of the Financial Statements.

Liquidity, cash flow and capital resources

At June 30, 2024, the Company had cash and equivalents of $198.6 million (December 31, 2023 - $96.5 million).

Cash flow provided by operations during the three months ended June 30, 2024 was $34.7 million compared to $33.3 million for the prior period. The increase in cash flow provided by operations included the drawdown and sale of copper concentrate inventory and higher copper prices partially offset by the impact from the June union strike and mill availability due to planned crusher move and concurrent mill maintenance.

Cash flow provided by operations during the six months ended June 30, 2024 was $94.3 million compared to $61.3 million for the prior period. The increase in cash flow provided by operations was due primarily to higher copper sales volumes, copper prices and a weaker Canadian dollar and the drawdown and sale of finished inventory.

Cash used for investing activities during the three months ended June 30, 2024 was $80.8 million compared to $45.6 million for the same prior period. Investing cash flows in the second quarter includes $15.7 million for capital expenditures at Gibraltar (which includes $10.7 million for capitalized stripping costs, $4.5 million for sustaining capital, and $0.5 million for capital projects), $56.1 million of cash expenditures for Florence Copper and $4.8 million for the purchase of copper collars. Included in investing activities in the period is $4.5 million of 2023 performance payment to Sojitz in April.

Cash used for investing activities during the six months ended June 30, 2024 was $127.5 million compared to $77.6 million for the same prior period. Investing cash flows in the first half of 2024 includes $37.5 million for capital expenditures at Gibraltar (which includes $24.7 million for capitalized stripping costs, $9.8 million for sustaining capital, and $3.0 million for capital projects), $86.8 million of cash expenditures for Florence Copper and $6.8 million for the purchase of copper collars, offset by release of restricted cash relating to exchange of reclamation security of $12.5 million. Included in investing activities in the period is the Company’s 50% acquisition of Cariboo, which included an initial fixed payment of $5.0 million to Dowa and Furukawa and the pickup of the Company’s 50% share of Cariboo’s cash balance of $9.8 million offset by a $10 million second instalment to Sojitz in February and $4.5 million of 2023 performance payment to Sojitz in April.

Cash provided by financing activities for the three months ended June 30, 2024 was $87.0 million comprised of proceeds from issuance of the US$500 million senior secured notes of $670.4 million, Florence financings totaling $12.1 million, and $2.4 million of share-based compensation, partially offset by interest paid of $7.5 million, repayment of the US$400 million senior secured notes and call premium of $556.5 million, revolving credit facility repayment of $26.5 million, and Gibraltar equipment financing repayment of $7.5 million.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Cash provided by financing activities for the six months ended June 30, 2024 was $135.5 million comprised of proceeds from issuance of the US$500 million senior secured notes of $670.4 million, Florence financings totaling $90.5 million, and $2.2 million of share-based compensation, partially offset by interest paid of $31.1 million, repayment of the US$400 million senior secured notes and call premium of $556.5 million, revolving credit facility repayment of $26.5 million, and Gibraltar equipment financing repayment of $13.6 million.

The Company has approximately $308 million of available liquidity at June 30, 2024, including a cash balance of $199 million and its undrawn US$80 million revolving credit facility. During the second quarter the Company repaid the outstanding balance of US$20 million on its revolving credit facility that was outstanding at March 31, 2024. 

On April 23, 2024, the Company completed an offering of US$500 million aggregate principal amount of 8.25% Senior Secured Notes due May 1, 2030. A portion of the proceeds were used to redeem the outstanding US$400 million 7% Senior Secured Notes. The remaining proceeds, net of transaction costs, call premium and accrued interest, of approximately $110 million are available for capital expenditures, including at Florence Copper and Gibraltar, working capital and for general corporate purposes.

An insurance claim has now been finalized for property damage and business interruption arising from a component in Concentrator #2, and insurance proceeds of US$22.1 million are expected to be received in the third quarter.

Based on current copper prices and forecast copper production and with copper collar hedges in place, stable operating margins and cash flows are expected from Gibraltar for the remainder of 2024. Other than refurbishment of the SX/EW plant over the next 12 months, Gibraltar has no other significant capital projects planned for 2024.

With construction underway at Florence Copper, the Company has entered into significant capital commitments for the completion of the construction of the commercial facility. Management anticipates that the construction of Florence Copper is now fully funded, and the Company intends to finance the remaining project costs over the next eighteen months from available liquidity, remaining instalments from Mitsui, cashflow from Gibraltar and/or its undrawn corporate credit facility.

If needed, the Company could raise further additional capital through equity financings or asset sales, including royalties, sales of project interests, or joint ventures, or additional credit facilities, including additional notes offerings or increasing the size of its revolving credit line with commercial banks. The Company evaluates these financing alternatives based on a number of factors including the prevailing metal prices and projected operating cash flow from Gibraltar, relative valuation, liquidity requirements, covenant restrictions and other factors, in order to optimize the Company's cost of capital and maximize shareholder value.

Future changes in copper and molybdenum market prices could also impact the timing and amount of cash available for future investment in the Company's capital commitments and development projects, debt obligations, and other uses of capital. To mitigate commodity price risks in the short-term, copper price options are entered into for a substantial portion of Taseko's share of Gibraltar copper production and the Company has a long track record of doing so.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Hedging strategy

The Company generally fixes substantially all of the copper prices of its copper concentrate shipments at the time of shipment. Where the customer's offtake contract does not provide a price fixing option, the Company may look to undertake a quotational period hedge directly with a financial institution as the counterparty in order to fix the price of the shipment.

To protect against sudden and unexpected copper price volatility in the market, the Company's hedging strategy aims to secure a minimum price for a significant portion of future copper production using copper put options that are either purchased outright or substantially funded by the sale of copper call options that are out of the money. The amount and duration of the copper hedge position is based on an assessment of business-specific risk elements combined with the copper pricing outlook. Copper price and quantity exposure are reviewed regularly to ensure that adequate revenue protection is in place.

Hedge positions are typically extended by adding incremental quarters at established floor prices (i.e. the strike price of the copper put option) to provide the necessary price protection. Considerations for the cost of the hedging program include an assessment of Gibraltar's estimated production costs, copper price trends and the Company's fixed capital requirements during the relevant period. During periods of volatility or step changes in the copper price, the Company may revisit outstanding hedging contracts and determine whether the copper put (floor) or call (ceiling) levels should be adjusted in line with the market while maintaining copper price protection.

From time to time, the Company will look at potential hedging opportunities to mitigate the risk of rising input costs, including foreign exchange and fuel prices where such a strategy is cost effective. To protect against a potential operating margin squeeze that could arise from oil and diesel price shocks, the Company purchases fuel call options to provide a price cap for its share of diesel that is used by its mining fleet.

A summary of the Company's outstanding hedges are shown below:

 

Notional amount

Strike price

Term to maturity

Original cost

         

At June 30, 2024

 

 

 

 

         

Copper collars

42 million lbs

Floor - US$3.75 per lb
Ceiling - US$5.00 per lb

H2 2024

$2.0 million

         

Copper collars

54 million lbs

Floor - US$4.00 per lb
Ceiling - US$5.00 per lb

H1 2025

$2.6 million

         

Copper collars

54 million lbs

Floor - US$4.00 per lb
Ceiling - US$5.40 per lb

H2 2025

$2.2 million

Total

150 million lbs

 

 

$6.8 million



TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Commitments and contingencies

    Payments due        
(Cdn$ in thousands)   Remainder
of 2024
    2025     2026     2027     2028     Thereafter     Total  
Debt:                                          
  2030 Notes   -     -     -     -     -     684,000     684,000  
  Interest   29,312     56,430     56,430     56,430     56,430     84,645     339,677  
Equipment loans:                                          
  Principal   9,485     20,648     22,609     9,523     6,895     -     69,160  
  Interest   2,993     4,624     2,663     1,085     295     -     11,660  
Lease liabilities:                                          
  Principal   5,372     5,241     2,590     1,131     257     173     14,764  
  Interest   587     579     213     75     16     5     1,475  
Cariboo acquisition payments - Sojitz1   -     10,000     10,000     10,000     10,000     -     40,000  
Cariboo acquisition payments - Dowa and Furukawa2   -     -     8,000     8,000     8,000     88,000     112,000  
PER3   -     -     -     -     -     168,439     168,439  
Capital expenditures   55,649     -     -     -     -     -     55,649  
Other expenditures                                          
  Transportation related services4   6,334     7,729     1,463     -     -     -     15,526  

1 On March 15, 2023, the Company completed its acquisition of an additional 12.5% interest in Gibraltar from Sojitz. The acquisition price consists of a minimum amount of $60 million payable over a five-year period and potential contingent payments depending on Gibraltar copper revenue and copper prices over the five year period. Remaining minimum amounts will be paid in $10 million annual instalments over the remaining four years. The Company estimates that there is $33 million payable over the next 4 years relating to the contingent consideration payable to Sojitz for its acquisition of the 12.5% interest in the shares of Cariboo which is not included in the table above.

2 On March 25, 2024, the Company completed the acquisition of the remaining 50% of Cariboo from Dowa and Furukawa. The acquisition price payable to Dowa and Furukawa is a minimum of $117 million and a maximum of $142 million payable over a 10-year payment period, with the quantum and timing of payment depending on LME copper prices and the cashflow of Gibraltar. An initial $5 million payment was made to Dowa and Furukawa on closing. The remaining cash consideration will be repayable in annual payments commencing in March 2026. The above commitment table assumes an annual payment to Dowa and Furukawa of $8 million based on a US$4.25 per pound copper price.  Any outstanding balance on the minimum acquisition amount of $117 million will be repayable in a final balloon payment in March 2034.

3 Provision for environmental rehabilitation amounts presented in the table represents the present value of estimated costs of legal and constructive obligations required to retire an asset, including decommissioning and other site restoration activities, primarily for Gibraltar and Florence Copper. As at June 30, 2024, the Company has provided surety bonds of $108.5 million for Gibraltar's reclamation security. For Florence Copper, the Company has provided to the federal and state regulator surety bonds totaling $49.3 million as reclamation security.

4 Transportation related services commitments include ocean freight and port handling services, which are both cancelable upon certain operating circumstances.

The Company has made minimum capital expenditure commitments relating to equipment, contractors and other supplies for the Florence Copper project totaling $44.0 million as at June 30, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Summary of Quarterly Results 

 

2024

2023

2022

(Cdn$ in thousands,
except per share amounts)

Q2

Q1

Q4

Q3

Q2

Q1

Q4

Q3

Revenues

137,730

146,947

153,694

143,835

111,924

115,519

100,618

89,714

Net (loss) income

(10,953)

18,896

38,076

871

9,991

33,788

(2,275)

(23,517)

Basic EPS

(0.04)

0.07

0.13

-

0.03

0.12

(0.01)

(0.08)

Adjusted net income (loss) *

30,503

7,728

24,060

19,659

(4,376)

5,088

7,146

4,513

Adjusted basic EPS *

0.10

0.03

0.08

0.07

(0.02)

0.02

0.02

0.02

Adjusted EBITDA *

70,777

49,923

69,107

62,695

22,218

36,059

35,181

34,031

 

           

(US$ per pound, except where indicated)

           

Average realized copper price

4.49

3.89

3.75

3.83

3.78

4.02

3.66

3.48

Total operating costs *

2.99

2.46

1.91

2.20

2.66

2.94

2.75

2.72

Copper sales (million pounds)

22.6

27.7

31.4

28.1

22.8

20.8

19.1

20.0

Financial results for the last eight quarters reflect: volatile copper and molybdenum prices and foreign exchange rates that impact realized sale prices; and variability in the quarterly sales volumes due to copper grades and timing of shipments which impacts revenue recognition. In addition, first quarter of 2024 and 2023 were impacted by the gain recorded on the purchase price allocation for the Cariboo acquisition.

Critical Accounting Policies and Estimates 

The Company's material accounting policies are presented in Note 2.4 of the 2023 annual consolidated financial statements. The preparation of the financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies, including the accounting for the Cariboo acquisition and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates. Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

In the process of applying the Company's accounting policies, significant areas where judgment is required include the determination of a joint arrangement, determining the timing of transfer of control of inventory for revenue recognition, provisions for environmental rehabilitation, reserve and resource estimation, functional currency, determination of the accounting treatment of the advance payment under the silver purchase and sale agreement reported as deferred revenue, determination of business or asset acquisition treatment, and recovery of other deferred tax assets.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Significant areas of estimation include reserve and resource estimation; fair value of assets and liabilities acquired in a business combination, asset valuations and the measurement of impairment charges or reversals; valuation of inventories; plant and equipment lives; tax provisions; provisions for environmental rehabilitation; valuation of financial instruments and derivatives; capitalized stripping costs and share-based compensation. Key estimates and assumptions made by management with respect to these areas have been disclosed in the notes to these consolidated financial statements as appropriate.

The accuracy of reserve and resource estimates is a function of the quantity and quality of available data and the assumptions made and judgment used in the engineering and geological interpretation, and may be subject to revision based on various factors. Changes in reserve and resource estimates may impact the carrying value of property, plant and equipment; the calculation of depreciation expense; the capitalization of stripping costs incurred during production; and the timing of cash flows related to the provision for environmental rehabilitation.

Changes in forecast prices of commodities, exchange rates, production costs and recovery rates may change the economic status of reserves and resources. Forecast prices of commodities, exchange rates, production costs and recovery rates, and discount rates assumptions, either individually or collectively, may impact the carrying value of derivative financial instruments, inventories, property, plant and equipment, and intangibles, as well as the measurement of impairment charges or reversals. These items also impacted the fair values of assets and liabilities recorded in the acquisition disclosed in the Note 4 of the 2023 annual consolidated financial statements and Note 3 of the Financial Statements.

There were no changes in accounting policies during the six months ended June 30, 2024.

Internal and Disclosure Controls Over Financial Reporting 

The Company's management is responsible for establishing and maintaining adequate internal control over financial reporting (ICFR) and disclosure controls and procedures (DC&P).

The Company's internal control system over financial reporting is designed to provide reasonable assurance to management and the Board of Directors regarding the preparation and fair presentation of published financial statements. Internal control over financial reporting includes those policies and procedures that:

(1) pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the Company;

(2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with IFRS, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and

(3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company's assets that could have a material effect on the financial statements.

The Company's internal control system over disclosure controls and procedures is designed to provide reasonable assurance that material information relating to the Company is made known to management and disclosed to others and information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by us under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

All internal control systems, no matter how well designed, have inherent limitations. Therefore, even those systems determined effective can provide only reasonable assurance with respect to financial reporting and disclosure.

There have been no changes in our internal controls over financial reporting and disclosure controls and procedures during the six months ended June 30, 2024 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting and disclosure.

Key Management Personnel

Key management personnel include the members of the Board of Directors and executive officers of the Company.

The Company contributes to a post-employment defined contribution pension plan on the behalf of certain key management personnel. This retirement compensation arrangement ("RCA Trust") was established to provide benefits to certain executive officers on or after retirement in recognition of their long service. Upon retirement, the participant is entitled to the distribution of the accumulated value of the contributions under the RCA Trust. Obligations for contributions to the defined contribution pension plan are recognized as compensation expense in the periods during which services are rendered by the executive officers.

Certain executive officers are entitled to termination and change in control benefits. In the event of termination without cause, other than a change in control, these executive officers are entitled to an amount ranging from
12-month to 18-months' salary. In the event of a change in control, if a termination without cause or a resignation occurs within 12 months following the change of control, these executive officers are entitled to receive, among other things, an amount ranging from 12-months' to 24-months' salary and accrued bonus, and all stock options held by these individuals will fully vest.

Executive officers and directors also participate in the Company's share option program (refer to Note 16b of the Financial Statements).

Compensation for key management personnel (including all members of the Board of Directors and executive officers) is as follows:

    Three months ended
June 30,
    Six months ended
June 30,
 
(Cdn$ in thousands)   2024     2023     2024     2023  
Salaries and benefits   713     897     3,308     3,146  
Post-employment benefits   220     304     440     482  
Share-based compensation expense   2,185     118     7,046     3,051  
    3,118     1,319     10,794     6,679  


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Non-GAAP Performance Measures

This document includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company's performance. These measures have been derived from the Company's financial statements and applied on a consistent basis. The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measure.

Total operating costs and site operating costs, net of by-product credits

Total costs of sales include all costs absorbed into inventory, as well as transportation costs and insurance recoverable. Site operating costs are calculated by removing net changes in inventory, depletion and amortization, insurance recoverable, and transportation costs from cost of sales. Site operating costs, net of by-product credits is calculated by subtracting by-product credits from the site operating costs. Site operating costs, net of by-product credits per pound are calculated by dividing the aggregate of the applicable costs by copper pounds produced. Total operating costs per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by the copper pounds produced. By-product credits are calculated based on actual sales of molybdenum (net of treatment costs) and silver during the period divided by the total pounds of copper produced during the period. These measures are calculated on a consistent basis for the periods presented.

(Cdn$ in thousands, unless otherwise indicated)   2024
Q2
    2024
Q11
    2023
Q41
    2023
Q31
    2023
Q21
 
Cost of sales   108,637     122,528     93,914     94,383     99,854  
Less:                              
Depletion and amortization   (13,721 )   (15,024 )   (13,326 )   (15,993 )   (15,594 )
Net change in inventories of finished goods   (10,462 )   (20,392 )   (1,678 )   4,267     3,356  
Net change in inventories of ore stockpiles   1,758     2,719     (3,771 )   12,172     2,724  
Transportation costs   (6,408 )   (10,153 )   (10,294 )   (7,681 )   (6,966 )
Site operating costs   79,804     79,678     64,845     87,148     83,374  
Oxide ore stockpile reclassification from capitalized stripping   -     -     -     -     (3,183 )
Less by-product credits:                              
Molybdenum, net of treatment costs   (7,071 )   (6,112 )   (5,441 )   (9,900 )   (4,018 )
Silver, excluding amortization of deferred revenue   (144 )   (137 )   124     290     (103 )
Site operating costs, net of by-product credits   72,589     73,429     59,528     77,538     76,070  
Total copper produced (thousand pounds)   20,225     26,694     29,883     30,978     24,640  
Total costs per pound produced   3.59     2.75     1.99     2.50     3.09  
Average exchange rate for the period (CAD/USD)   1.37     1.35     1.36     1.34     1.34  
Site operating costs, net of by-product credits (US$ per pound)   2.62     2.04     1.46     1.87     2.30  


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(Cdn$ in thousands, unless otherwise indicated)   2024
Q2
    2024
Q11
    2023
Q41
    2023
Q31
    2023
Q21
 
Site operating costs, net of by-product credits   72,589     73,429     59,528     77,538     76,070  
Add off-property costs:                              
Treatment and refining costs   3,941     4,816     7,885     6,123     4,986  
Transportation costs   6,408     10,153     10,294     7,681     6,966  
Total operating costs   82,938     88,398     77,707     91,342     88,022  
Total operating costs (C1) (US$ per pound)   2.99     2.46     1.91     2.20     2.66  

1 Q2, Q3 and Q4 2023 includes the impact from the March 15, 2023 acquisition of Cariboo from Sojitz, which increased the Company's Gibraltar ownership from 75% to 87.5%. Q1 2024 includes the impact from the March 25, 2024 acquisition of Cariboo from Dowa and Furukawa, which increased the Company's Gibraltar ownership from 87.5% to 100%.

Total Site Costs

Total site costs are comprised of the site operating costs charged to cost of sales as well as mining costs capitalized to property, plant and equipment in the period. This measure is intended to capture Taseko's share of the total site operating costs incurred in the quarter at Gibraltar calculated on a consistent basis for the periods presented.

(Cdn$ in thousands, unless otherwise indicated) - 87.5% basis (except for Q1 2024 and Q2 2024)   2024
Q2
    2024
Q11
    2023
Q41
    2023
Q31
    2023
Q21
 
Site operating costs   79,804     79,678     64,845     87,148     83,374  
Add:                              
Capitalized stripping costs   10,732     16,152     31,916     2,083     8,832  
Total site costs - Taseko share   90,536     95,830     96,761     89,231     92,206  
Total site costs - 100% basis   90,536     109,520     110,584     101,978     105,378  

1 Q2, Q3 and Q4 2023 includes the impact from the March 15, 2023 acquisition of Cariboo from Sojitz, which increased the Company's Gibraltar ownership from 75% to 87.5%. Q1 2024 includes the impact from the March 25, 2024 acquisition of Cariboo from Dowa and Furukawa, which increased the Company's Gibraltar ownership from 87.5% to 100%.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Adjusted net income (loss) and Adjusted EPS

Adjusted net income (loss) removes the effect of the following transactions from net income as reported under IFRS:

Management believes these transactions do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, unrealized gains/losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.

Adjusted net income (loss) and Adjusted EPS

(Cdn$ in thousands, except per share amounts)   2024
Q2
    2024
Q1
    2023
Q4
    2023
Q3
 
Net (loss) income   (10,953 )   18,896     38,076     871  
Unrealized foreign exchange loss (gain)   5,408     13,688     (14,541 )   14,582  
Unrealized loss on derivatives   10,033     3,519     1,636     4,518  
Other operating costs   10,435     -     -     -  
Call premium on settlement of debt   9,571     -     -     -  
Loss on settlement of long-term debt, net of capitalized interest   2,904     -     -     -  
Gain on Cariboo acquisition   -     (47,426 )   -     -  
Gain on acquisition of control of Gibraltar**   -     (14,982 )   -     -  
Realized gain on sale of inventory***   4,633     13,354     -     -  
Realized gain on processing of ore stockpiles****   3,191     -     -     -  
Accretion and fair value adjustment on Florence royalty obligation   2,132     3,416     -     -  
Accretion and fair value adjustment on consideration payable to Cariboo   8,399     1,555     (916 )   1,244  
Non-recurring other expenses for Cariboo acquisition   394     138     -     -  
Estimated tax effect of adjustments   (15,644 )   15,570     (195 )   (1,556 )
Adjusted net income   30,503     7,728     24,060     19,659  
Adjusted EPS   0.10     0.03     0.08     0.07  


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(Cdn$ in thousands, except per share amounts)   2023
Q2
    2023
Q1
    2022
Q4
    2022
Q3
 
Net income (loss)   9,991     33,788     (2,275 )   (23,517 )
Unrealized foreign exchange (gain) loss   (10,966 )   (950 )   (5,279 )   28,083  
Unrealized (gain) loss on derivatives   (6,470 )   2,190     20,137     (72 )
Gain on Cariboo acquisition   -     (46,212 )   -     -  
Accretion and fair value adjustment on consideration   payable to Cariboo   1,451     -     -     -  
Non-recurring other expenses for Cariboo acquisition   263     -     -     -  
Estimated tax effect of adjustments   1,355     16,272     (5,437 )   19  
Adjusted net (loss) income   (4,376 )   5,088     7,146     4,513  
Adjusted EPS   (0.02 )   0.02     0.02     0.02  

**The $15.0 million gain on acquisition of control of Gibraltar in Q1 2024 relates to the write-up of finished copper concentrate inventory for Taseko's 87.5% share to its fair value at March 25, 2024. 

*** Cost of sales for the three months ended June 30, 2024 included $4.6 million in write-ups to net realizable value for concentrate inventory held at March 25, 2024 that were subsequently sold in April. The realized portion of the gains recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were sold.

**** Cost of sales for the three months ended June 30, 2024 included $3.2 million in write-ups to net realizable value for ore stockpiles held at March 25, 2024 that were subsequently processed in the second quarter. The realized portion of the write-ups recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were processed.

Adjusted EBITDA

Adjusted EBITDA is presented as a supplemental measure of the Company's performance and ability to service debt. Adjusted EBITDA is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present Adjusted EBITDA when reporting their results. Issuers of "high yield" securities also present Adjusted EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet debt service obligations.

Adjusted EBITDA represents net income before interest, income taxes, and depreciation and also eliminates the impact of a number of items that are not considered indicative of ongoing operating performance. Certain items of expense are added and certain items of income are deducted from net income that are not likely to recur or are not indicative of the Company's underlying operating results for the reporting periods presented or for future operating performance and consist of:


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(Cdn$ in thousands)   2024
Q2
    2024
Q1
    2023
Q4
    2023
Q3
 
Net (loss) income   (10,953 )   18,896     38,076     871  
Add:                        
Depletion and amortization   13,721     15,024     13,326     15,993  
Finance expense   21,271     19,849     12,804     14,285  
Finance income   (911 )   (1,086 )   (972 )   (322 )
Income tax (recovery) expense   (3,247 )   23,282     17,205     12,041  
Unrealized foreign exchange loss (gain)   5,408     13,688     (14,541 )   14,582  
Unrealized loss on derivatives   10,033     3,519     1,636     4,518  
Amortization of share-based compensation expense   2,585     5,667     1,573     727  
Other operating costs   10,435     -     -     -  
Call premium on settlement of debt   9,571     -     -     -  
Loss on settlement of long-term debt   4,646     -     -     -  
Gain on Cariboo acquisition   -     (47,426 )   -     -  
Gain on acquisition of control of Gibraltar**   -     (14,982 )   -     -  
Realized gain on sale of inventory***   4,633     13,354     -     -  
Realized gain on processing of ore stockpiles****   3,191     -     -     -  
Non-recurring other expenses for Cariboo acquisition   394     138     -     -  
Adjusted EBITDA   70,777     49,923     69,107     62,695  

**The $15.0 million gain on acquisition of control of Gibraltar in Q1 2024 relates to the write-up of finished copper concentrate inventory for Taseko's 87.5% share to its fair value at March 25, 2024. 

*** Cost of sales for the three months ended June 30, 2024 included $4.6 million in write-ups to net realizable value for concentrate inventory held at March 25, 2024 that were subsequently sold in April. The realized portion of the gains recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were sold.

**** Cost of sales for the three months ended June 30, 2024 included $3.2 million in write-ups to net realizable value for ore stockpiles held at March 25, 2024 that were subsequently processed in the second quarter. The realized portion of the write-ups recorded in the prior quarter for GAAP purposes have been included in Adjusted net income (loss) in the current quarter reflecting the period they were processed.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(Cdn$ in thousands)   2023
Q2
    2023
Q1
    2022
Q4
    2022
Q3
 
Net income(loss)   9,991     33,788     (2,275 )   (23,517 )
Add:                        
Depletion and amortization   15,594     12,027     10,147     13,060  
Finance expense   13,468     12,309     10,135     12,481  
Finance income   (757 )   (921 )   (700 )   (650 )
Income tax expense   678     20,219     1,222     3,500  
Unrealized foreign exchange (gain) loss   (10,966 )   (950 )   (5,279 )   28,083  
Unrealized (gain) loss on derivatives   (6,470 )   2,190     20,137     (72 )
Amortization of share-based compensation expense   417     3,609     1,794     1,146  
Gain on Cariboo acquisition   -     (46,212 )   -     -  
Non-recurring other expenses for Cariboo acquisition   263     -     -     -  
Adjusted EBITDA   22,218     36,059     35,181     34,031  

Earnings from mining operations before depletion and amortization

Earnings from mining operations before depletion and amortization is earnings from mining operations with depletion and amortization, also any items that are not considered indicative of ongoing operating performance are added back. The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the results of the Company's operations and financial position and it is meant to provide further information about the financial results to investors.

    Three months ended
June 30,
    Six months ended
June 30,
 
(Cdn$ in thousands)   2024     2023     2024     2023  
Earnings from mining operations   44,948     12,070     69,367     41,182  
Add:                        
  Depletion and amortization   13,721     15,594     28,745     27,621  
  Realized gain on sale of inventory   4,633     -     17,987     -  
  Realized gain on processing of ore stockpiles   3,191     -     3,191     -  
  Other operating costs   10,435     -     10,435     -  
Earnings from mining operations before depletion, amortization and non-recurring items   76,928     27,664     129,725     68,803  

During the three and six months ended June 30, 2024, the realized gains on sale of inventory and processing of ore stockpiles relates to inventory held at March 25, 2024 that was written-up from book value to net realizable value and subsequently sold or processed between March 26 and June 30, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Site operating costs per ton milled

The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the Company's site operations on a tons milled basis.

(Cdn$ in thousands, except per ton milled amounts)   2024
Q2
    2024
Q11
    2023
Q41
    2023
Q31
    2023
Q21
 
Site operating costs (included in cost of  sales) - Taseko share   79,804     79,678     64,845     87,148     83,374  
Site operating costs - 100% basis   79,804     90,040     74,109     99,598     95,285  
Tons milled (thousands)   5,728     7,677     7,626     8,041     7,234  
Site operating costs per ton milled $ 13.93   $ 11.73   $ 9.72   $ 12.39   $ 13.17  

1 Q2, Q3 and Q4 2023 includes the impact from the March 15, 2023 acquisition of Cariboo from Sojitz, which increased the Company's Gibraltar ownership from 75% to 87.5%. Q1 2024 includes the impact from the March 25, 2024 acquisition of Cariboo from Dowa and Furukawa, which increased the Company's Gibraltar ownership from 87.5% to 100%.

Technical Information

The technical information contained in this MD&A related to the Florence Copper Project is based upon the report entitled: "NI 43-101 Technical Report - Florence Copper Project, Pinal County, Arizona" issued March 30, 2023 with an effective date of March 15, 2023 which is available on SEDAR+. The Florence Copper Project Technical Report was prepared under the supervision of Richard Tremblay, P.Eng., MBA, Richard Weymark, P.Eng., MBA, and Robert Rotzinger, P.Eng. Mr. Tremblay is employed by the Company as Chief Operating Officer, Mr. Weymark is Vice President Engineering, and Robert Rotzinger is Vice President Capital Projects. All three are Qualified Persons as defined by NI 43-101.