Q1 2015 Teekay LNG Partners LP Earnings Call

May 15, 2015 AM EDT
TGP - Teekay LNG Partners LP
Q1 2015 Teekay LNG Partners LP Earnings Call
May 15, 2015 / 03:00PM GMT 

==============================
Corporate Participants
==============================
   *  Ryan Hamilton
      Teekay LNG Partners L.P. - IR
   *  Peter Evensen
      Teekay LNG Partners L.P. - CEO

==============================
Conference Call Participants
==============================
   *  Spiro Dounis
      UBS Securities - Analyst
   *  Matthias Detjen
      Morgan Stanley - Analyst
   *  Sunil Sibal
      Global Hunter Securities - Analyst
   *  TJ Schultz
      RBC Capital Markets - Analyst
   *  Ben Brownlow
      Raymond James - Analyst

==============================
Presentation
------------------------------
Operator   [1]
------------------------------
 Welcome to Teekay LNG Partners' first-quarter 2015 earnings results conference call.

 (Operator Instructions)

 As a reminder, this call is being recorded. Now, for opening remarks and introductions, I would like to turn the call over to Mr. Peter Evensen, Teekay LNG Partners' Chief Executive Officer. Please go ahead, sir.

------------------------------
 Ryan Hamilton,  Teekay LNG Partners L.P. - IR   [2]
------------------------------
 Before Mr. Evensen begins, I'd like to direct all participants to our website, at www.teekay.com, where you'll find a copy of the first-quarter 2015 earnings presentation. Mr. Evensen will review this presentation during today's conference call. Please allow me to remind you that our discussion today contains forward-looking statements. Actual results may differ materially from results projected by those forward-looking statements. Additional information concerning factors that could cause actual results to materially differ from those in the forward-looking statements is contained in the first-quarter 2015 earnings release and earnings presentation, available on our website.

 I'll now turn the call over to Mr. Evensen to begin.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [3]
------------------------------
 Thank you, Ryan. Good morning, everyone, and thank you for joining us on our first-quarter investor conference call. I'm joined today by Teekay Corporation's CFO, Vince Lok; and MLP Controller, David Wong. During our call today, I will be taking you through the earnings presentation, which can be found on our website.

 Turning to slide 3 of the presentation, I will review some of Teekay LNG's recent highlights. For the first quarter of 2015, the Partnership generated distributable cash flow of $66.2 million, an increase of 10% from the same period of the prior year. We achieved a coverage ratio of 1.04 times, which was negatively impacted by an off-hire dispute we are currently involved in with the charterer of the 52%-owned Magellan Spirit.

 During the first quarter, the Magellan Spirit was involved in a grounding incident, and the charterer subsequently claimed that the vessel was off hire for an aggregate period, which they believe gives them the right to terminate the contract. We're disputing the off-hire claim and the right to terminate the contract, which would have otherwise expired in September of 2016. For accounting purposes, we've taken a conservative approach, and did not accrue the disputed off-hire period and related cargo boil-off costs, which reduced the Partnership's cash flow by approximately $3 million in the first quarter.

 For the first quarter of 2015, the Partnership declared a cash distribution of $0.70 per unit, consistent with the previous quarter. In January of this year, Teekay LNG's LPG joint venture with Exmar took delivery of the fourth of its 12 mid-sized LPG newbuildings which form part of the joint venture's fleet renewal and growth strategy. And, lastly, in early May, Teekay LNG successfully completed a $130-million unsecured Norwegian bond offering, at an all-in interest rate of 5.92%, expressed in US dollars.

 Turning to slide 4, the pictures on this slide show the keel laying at the top, and the installation of an M-type electronically controlled gas injection, or MEGI, engine -- at the bottom of the slide -- in the world's first MEGI LNG carrier, the Creole Spirit, which delivers in the first quarter of 2016.

 Following delivery, the Creole Spirit will commence a five-year charter contract with Cheniere Energy, exporting LNG, primarily from Cheniere's Sabine Pass LNG liquefaction facility in Louisiana. The Creole Spirit, which is the first of nine MEGI LNG newbuildings, which will be delivered to our Partnership between 2016 and 2018. As announced last quarter, we've already signed contracts with Shell for five of the MEGI LNG newbuilds, and we're actively bidding on long-term charters for the remaining two MEGI newbuildings.

 Turning to slide 5, we take a look at both the current and long-term market for LNG shipping. The current weakness in the LNG shipping market is due to an increase in the number of vessels available on the short and spot market, against a minimal increase in global LNG trade. Several factors have led to an increase in the supply of vessels on the spot market. Since the start of 2014, we've seen the delivery of 15 new uncommitted LNG carriers into the global fleet.

 In addition, outages at LNG export facilities in Yemen and Angola have temporarily added vessels to the spot market. Finally, the LNG vessels that will serve the new Australian export projects have started to deliver. And these vessels are currently available on the spot market, until the liquefaction plants start production later this year. Overall, there's roughly 45 vessels currently available on the spot market, which is more than the 10 to 20 vessels that were typically available during 2014.

 While the supply of vessels has increased, the volume of LNG traded has not. Total LNG trade increased by only 1% in 2014. In addition, as shown in the chart at the top right of the slide, the price difference between LNG in the UK and Japan has decreased, from roughly $6 per million BTU, to near zero today. This has reduced the arbitrage trading between the Atlantic and Pacific basins, resulting in less long-haul trade and weaker ton-mile demand in the first quarter of 2015. As a result, short-term charter rates for modern LNG vessels have decreased to less than $30,000 per day. Despite this near-term weakness, the long-term growth of LNG exports remains on track. And we expect to see LNG vessel utilization improving from late 2015.

 More than 120 million tons of future LNG export capacity has already reached FID, and is in various stages of construction. Four separate projects are scheduled to start up in the second half of 2015, followed by the startup of Cheniere's Sabine Pass project in early 2016. In addition, new export projects in the US continue to be developed. Cheniere recently made its final investment decision to proceed with Corpus Christi export one and two, and they also intend to make a final decision on expanding the Sabine Pass project by the end of 2015. Lastly, Sempra Energy has recently requested the approval to add two more liquefaction trains at their Cameron export project, which is already under construction.

 So, the final point I'd like to make is, as I noted last quarter, we continue to see an upside from lower LNG prices. Lower prices encourage LNG demand in new and existing import countries, which supports the long-term growth of LNG trade, and creates an expanding market for Teekay LNG's services.

 On slide 6, I'll review the financial results for the first quarter of 2015, as compared to the fourth quarter of 2014. For a reconciliation of distributable cash flow to net income, please refer to Appendix B of our earnings release.

 If we start at the top of the statement, net voyage revenues decreased due to two fewer calendar days in the first quarter, and the weakening of the euro against the US dollar on euro-denominated revenues, partially offset by scheduled and unscheduled off-hire days related to two vessels in Q4, and the acquisition of the Norgas Napa in November of 2014. Vessel operating expenses decreased due to the foreign-exchange impact on euro-denominated operating expenses and higher maintenance campaigns in Q4. General and administrative expenses increased, due to the timing of recognition of long-term incentive compensation expenses, which are typically higher in the first quarter of each year.

 The Partnership's share of distributable cash flow related to our equity accounted joint ventures, net of estimated maintenance CapEx reserve, decreased by $5.5 million, primarily due to the grounding incident and related off-hire dispute on the Magellan Spirit, the scheduled expiration of the Methane Spirit charter in mid-March, and repairs on the Woodside Donaldson -- all three of which are part of our 52%-owned joint venture with Marubeni Corporation. These decreases were partially offset by the delivery and charter of our fourth LPG newbuilding carrier, and our 50% joint venture with Exmar.

 In the second quarter, the distributable cash flow from our equity accounted joint ventures is expected to decline by a further $5 million, mainly due to the full-quarter impact of both the Methane Spirit and the Magellan Spirit being off hire. We have secured short-term charters for both of these vessels, commencing in September of 2015, and we're actively seeking to secure additional employment for these vessels until September 2015.

 Interest expense decreased resulting from the RasGas II lease terminations and associated debt refinancing last quarter. As a result, our coverage ratio decreased to 1.04 times during the first quarter, compared to 1.09 times in the prior quarter. Our Q2 coverage ratio will likely dip below 1 times, as a result of the Magellan Spirit and Methane Spirit that I discussed earlier.

 Wrapping up on slide number 7, Teekay LNG's total committed growth CapEx now stands at approximately $3.4 billion. One project I would like to point to on this slide is the Yamal LNG project. During Novatek's earnings conference call this week, they mentioned that the project is progressing well, and they are at a very advanced stage of negotiations regarding external debt financing for the project. And the project sponsors, Novatek, Total, and CNPC, have invested approximately $9.2 billion into the Yamal LNG project, as of the end of the reporting period, which is up from $7.6 billion at the end of December 2014. Going forward, we'll continue to update our investors on the progress of this important project and our ships, which will serve as a vital link between the project and their customers.

 Moving on, despite the current weakness in the spot and short-term LNG market, the long-term fundamentals of both the LNG and LPG shipping markets remain strong. And we believe our strategy of pre-ordering optimally sized MEGI LNG carriers will continue to serve us well, as these vessels are attractive to a wide range of potential LNG and FSRU projects. The robust pipeline of growth projects that is shown on this slide will provide Teekay LNG with steady and consistent distributable cash flow growth over the next several years, and we continue to bid on new growth opportunities.

 Thank you for joining us on the call today. And, operator, I am now available to take questions.

==============================
Questions and Answers
------------------------------
Operator   [1]
------------------------------
 Thank you. Ladies and gentlemen, we will now conduct a question-and-answer session.

 (Operator Instructions)

 Your first question today will come from Spiro Dounis with UBS Securities. Please go ahead.

------------------------------
 Spiro Dounis,  UBS Securities - Analyst   [2]
------------------------------
 Good morning, gentlemen. Thanks for taking my question. Just wanted to follow up on Magellan Spirit and Methane Spirit. It sounds like you answered this in the prepared remarks. But I guess between now and September, when those charters start, how should we be thinking about these vessels? Are they undergoing maintenance? Or could we actually see them do a spot voyage in between, before the charter commences?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [3]
------------------------------
 You could actually see them do spot voyages. We're tendering them on short-term voyages right now, and we expect to employ them. The only -- but they're on spot short-term voyages, 14 days up to 30 days. And we're using it in order to position them in on charters. But at the same time, we continue to assert our legal claims on the Magellan Spirit.

------------------------------
 Spiro Dounis,  UBS Securities - Analyst   [4]
------------------------------
 Great. That makes sense. And then just you mentioned pre-ordering before. So in terms of FSRUs, and a practice that's been in play by other owners has been to preorder the FSRU, then go to bid on a contract. I guess it makes it look more attractive. One, have you explored doing this to maybe win one of these bids? And could the DSME, the four options there, could one of those be converted to an FSRU, if you were to win a bid?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [5]
------------------------------
 Sure. The way we're looking at FSRUs, the market developed from conversions into people having newbuilding FSRUs. The type of projects we're bidding on, we can very well use our options, or convert some of our existing orders into FSRUs. And it really goes to the timing of the project. We're looking at longer-term projects that would start in 2018, 2019, 2020, which is when our ships come on. And so we're not available for an FSRU project that would like to start up in 2016. But that's okay. That's -- we're content not to take that risk as being an MLP.

------------------------------
 Spiro Dounis,  UBS Securities - Analyst   [6]
------------------------------
 Got you. And then could you just remind us again when those options expire?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [7]
------------------------------
 No, not for competitive reasons, I won't tell you.

------------------------------
 Spiro Dounis,  UBS Securities - Analyst   [8]
------------------------------
 Okay. Fair enough. Appreciate the color, guys. Thank you.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [9]
------------------------------
 Thank you.

------------------------------
Operator   [10]
------------------------------
 Thank you, your next question will come from Matthias Detjen with Morgan Stanley. Please go ahead.

------------------------------
 Matthias Detjen,  Morgan Stanley - Analyst   [11]
------------------------------
 So my question's on the demand side for LNG, going forward. We have a lot of supply coming on. And I was wondering if you could maybe comment on where you see the demand coming from? And if you believe that all this supply will be taken up somewhere?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [12]
------------------------------
 Sure. We do think that the short-term weakness that we have now, 40, 45 ships, according to some brokers at anchor, we can see the position list, we think that will close. And that will close, basically, because you're going to restart Angola in the fourth quarter of 2015, according to Chevron. We think Yemen will come back. And then we really have some Australian projects that are coming on, and one in Indonesia. So when these big ones, the Gorgon, the Gladstones come on, as well as a deal in -- or a liquefaction plant in Indonesia, these are significant tons coming on.

 And so that's going to soak up the market in 2015 -- or late 2015, into 2016. So we feel good about getting our ships in a 2017 to 2019. We only have two open ships right now. But we're actually quite pleasantly surprised at people wanting MEGI ships in that time frame. Because there's still export projects coming on in that time, where they haven't locked up the tonnage. And they desire to have MEGI tonnage.

------------------------------
 Matthias Detjen,  Morgan Stanley - Analyst   [13]
------------------------------
 Okay. And just -- because you're commenting on the MEGI tonnage again -- one of your competitors ordered a different kind of vessel, with a low-pressure, two-stroke engine. Could you maybe compare the two? Or is there a big difference between the two? Or do you think that these will be on par, the two vessel types, in terms of demand?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [14]
------------------------------
 So there's two different engine manufacturers. The ones we ordered, as I mentioned, it's the world's first. So that is -- one is high-pressure gas, one is low-pressure gas. There really isn't any difference in what customers measure, which is the consumption. The consumption, or rather the amount of fuel that the ships burn, whether they're either kind of two-stroke, is materially better than dual fuel diesel electric, which is why these are preferred vessels by people.

 And you're seeing, for example, Shell take our vessels. BP ordered some vessels for their own account. So we're very pleased that the MEGI has become the standard. And so what you're really saying is that the two-stroke engine is what the industry is moving toward.

------------------------------
 Matthias Detjen,  Morgan Stanley - Analyst   [15]
------------------------------
 Okay, that's very helpful. And I guess one last question is, on the -- so we have the liquefaction supply coming on. But do you think there is also going to be enough demand for that LNG, in end markets? I don't know, by utilities or those kind of things? Because we have this very large increase. Do you think all that capacity is going to be taken up?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [16]
------------------------------
 Yes, I think it will, because the gas price is at $13 to $18. There's places, like in India, where they can't afford it. But when you put the price down because it's linked to oil, then we're seeing a lot more projects in places like South America and India, where they can use more. And if you look at other big trends that are happening, it was really nice to see that European LNG imports -- and I don't know if it's a function of trying to reduce the dependence on Russia -- but they actually increased 23%, year on year. And whereas what happened was, it was a pretty warm winter, and South Korean imports actually dropped, as well as in Japan. So on the whole, if the arbitrage opens up again between the Atlantic and the Pacific, we should be fine.

------------------------------
 Matthias Detjen,  Morgan Stanley - Analyst   [17]
------------------------------
 That was very helpful. Thank you, Peter.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [18]
------------------------------
 Thank you.

------------------------------
Operator   [19]
------------------------------
 Thank you. Your next question will come from Sunil Sibal with Global Hunter Securities. Please go ahead.

------------------------------
 Sunil Sibal,  Global Hunter Securities - Analyst   [20]
------------------------------
 Hi. Good morning, guys. And thanks for the color on the LNG markets. I just had a follow-up on the different LNG ship designs. I think in the -- previously, you guys had talked about MEGI versus DFDE design, offering a fuel advantage of up to about $25,000 a day. I was curious, what's a good way to think about that number, now that probably the fuel prices have come in significantly?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [21]
------------------------------
 Yes. So it does offer fuel savings. It -- and so it all depends how fast you work it. I would say that, instead of $25,000, you're probably looking closer to $15,000, at these lower bunker prices.

------------------------------
 Sunil Sibal,  Global Hunter Securities - Analyst   [22]
------------------------------
 Okay. And so that's the advantage you will get with over DFDE design, also? Or what's the --

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [23]
------------------------------
 Yes. And you could get even much bigger sums against steam, as in $40,000 a day.

------------------------------
 Sunil Sibal,  Global Hunter Securities - Analyst   [24]
------------------------------
 Okay. Got it. Then I guess, seems like, on the FSRU markets, you're probably not bidding on any projects. But I was just curious, I think we're seeing some activity on LNG liquefaction kind of ships. And I think previously, with your Sevan JV, you would probably look at that market. I was curious if you have any view on that market developing in this current environment?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [25]
------------------------------
 Sure. To go to the first part of your question, we actually are bidding on FSRU projects. We haven't won them yet, but we continue to bid on FSRU, as well as just floating storage projects, using newbuildings, because we think that's a market that will continue to grow. And that allows gas to come more quickly into grids in developing countries. As far as the opposite, which is the FLNG, we are not currently looking at that market. We are looking at -- we're waiting for greater standardization in designs going on there.

 But we are looking very carefully at that. You mentioned one of our companies that we have a 43% on, the Sevan, so we know that, that design can be used. But we think ultimately, as you saw with the FSRU market, it will go toward near-shore terminals that will be built in yards, and that's what happened with the FSRU market. First, you did conversions, and then you went into newbuildings. And that's the way to get the real efficiencies, going forward.

------------------------------
 Sunil Sibal,  Global Hunter Securities - Analyst   [26]
------------------------------
 So I guess fair to assume that newbuilds will be probably more attractive [to you] where you think the market will go to, once it matures?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [27]
------------------------------
 Yes. So we're looking at designs, and we're also working -- looking at what the yards are coming up with. So right now, people are doing conversions of existing. But as you will know, older ships don't have the same cubic capacity as the newer ships. So with our new ships being 174,000 cubic, it would make sense that you had a FLNG that had closer to 160,000, 170,000 cubic, rather than the smaller cubic sizes that you would get with the conversion of an older unit.

------------------------------
 Sunil Sibal,  Global Hunter Securities - Analyst   [28]
------------------------------
 Okay. Thanks. Very helpful.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [29]
------------------------------
 Thank you.

------------------------------
Operator   [30]
------------------------------
 Thank you. Your next question will come from TJ Schultz with RBC Capital Markets. Please go ahead.

------------------------------
 TJ Schultz,  RBC Capital Markets - Analyst   [31]
------------------------------
 Great. Thanks. So at the analyst day, you guys provided some assumptions for Teekay parent free cash flow growth. And then 20% Teekay parent dividend growth per year, that contemplated distribution growth at TGP of 2% to 4% per year, basically increasing through 2018, to 4%. So I guess I'm just trying to see if there's any change in those forecast assumptions on TGP distribution growth potential, as you look at the CapEx committed, and long-term outlook on LNG and LPG fundamentals? Or do you think you need to be more cautious, near term?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [32]
------------------------------
 No, we continue to have that CapEx that will give that. Obviously, we don't have much growth in 2015, TJ. And as I said, we have this dispute with the Magellan Spirit, which we see as a temporary factor. But we think -- we're not accruing for it, but we think we'll ultimately get the bulk of the lost revenues that we're not accruing back. So for us, that's a temporary phenomenon.

 But no, our projects that power that, which is Shell, which is Cheniere, which is, in the later stages, Yamal, they are still there. But the good news is, as you -- since Investor Day, we've ordered one more ship, closed on the chartering of -- obviously with Shell, and we continue to bid on new projects. So we don't see any reason to move that.

------------------------------
 TJ Schultz,  RBC Capital Markets - Analyst   [33]
------------------------------
 Okay. That's all I had. Thank you.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [34]
------------------------------
 Thank you.

------------------------------
Operator   [35]
------------------------------
 Thank you. Your next question will come from Ben Brownlow with Raymond James. Please go ahead.

------------------------------
 Ben Brownlow,  Raymond James - Analyst   [36]
------------------------------
 Thanks for taking the question. You commented on the LNG supply/demand balance possibly tightening in the second half of this year. But just to clarify, it sounds like you're not anticipating, really, an upward move in shipping rates, until really moving into 2016. Are you expecting more of a rebound in the second half of this year? Or are you looking more for just a stabilization in rates?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [37]
------------------------------
 We actually think you have to wait for the tightening to happen, the liquefaction plants to come on. So I would say you should expect it to be weak through 2015, and start to see it move in 2016.

------------------------------
 Ben Brownlow,  Raymond James - Analyst   [38]
------------------------------
 Understood. And I would just be interested -- (multiple speakers)

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [39]
------------------------------
 And that's consistent with what we've been saying for about a year.

------------------------------
 Ben Brownlow,  Raymond James - Analyst   [40]
------------------------------
 Okay. And just what are your thoughts, or the key risk you see, in terms of that being pushed back further, later into 2016?

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [41]
------------------------------
 I think the risk is that the liquefaction plants that I mentioned in Australia, and some of the other ones, like Angola, don't start up when they're supposed to. Some have already had delays incorporated into them. But I think that's the risk, that you don't get those liquefaction plants starting up. But -- so we were happy that BG started up in Australia. And we think the really big one, which is Gorgon in AP, will come on, as well.

------------------------------
 Ben Brownlow,  Raymond James - Analyst   [42]
------------------------------
 Great. Thank you.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [43]
------------------------------
 Thank you.

------------------------------
Operator   [44]
------------------------------
 We seem to have no further questions at this time. I'll turn the call back over to Management for any closing comments.

------------------------------
 Peter Evensen,  Teekay LNG Partners L.P. - CEO   [45]
------------------------------
 All right. Thank you all very much for listening, and we look forward to reporting back to you next quarter. Thank you.

------------------------------
Operator   [46]
------------------------------
 Ladies and gentlemen, that does conclude our conference call for today. We thank you for your participation. You may now disconnect your lines, and have a great day.




------------------------------
Definitions
------------------------------
PRELIMINARY TRANSCRIPT: "Preliminary Transcript" indicates that the 
Transcript has been published in near real-time by an experienced 
professional transcriber.  While the Preliminary Transcript is highly 
accurate, it has not been edited to ensure the entire transcription 
represents a verbatim report of the call.

EDITED TRANSCRIPT: "Edited Transcript" indicates that a team of professional 
editors have listened to the event a second time to confirm that the 
content of the call has been transcribed accurately and in full.

------------------------------
Disclaimer
------------------------------
Thomson Reuters reserves the right to make changes to documents, content, or other 
information on this web site without obligation to notify any person of 
such changes.

In the conference calls upon which Event Transcripts are based, companies 
may make projections or other forward-looking statements regarding a variety 
of items. Such forward-looking statements are based upon current 
expectations and involve risks and uncertainties. Actual results may differ 
materially from those stated in any forward-looking statement based on a 
number of important factors and risks, which are more specifically 
identified in the companies' most recent SEC filings. Although the companies 
may indicate and believe that the assumptions underlying the forward-looking 
statements are reasonable, any of the assumptions could prove inaccurate or 
incorrect and, therefore, there can be no assurance that the results 
contemplated in the forward-looking statements will be realized.

THE INFORMATION CONTAINED IN EVENT TRANSCRIPTS IS A TEXTUAL REPRESENTATION
OF THE APPLICABLE COMPANY'S CONFERENCE CALL AND WHILE EFFORTS ARE MADE TO
PROVIDE AN ACCURATE TRANSCRIPTION, THERE MAY BE MATERIAL ERRORS, OMISSIONS,
OR INACCURACIES IN THE REPORTING OF THE SUBSTANCE OF THE CONFERENCE CALLS.
IN NO WAY DOES THOMSON REUTERS OR THE APPLICABLE COMPANY ASSUME ANY RESPONSIBILITY FOR ANY INVESTMENT OR OTHER
DECISIONS MADE BASED UPON THE INFORMATION PROVIDED ON THIS WEB SITE OR IN
ANY EVENT TRANSCRIPT. USERS ARE ADVISED TO REVIEW THE APPLICABLE COMPANY'S
CONFERENCE CALL ITSELF AND THE APPLICABLE COMPANY'S SEC FILINGS BEFORE
MAKING ANY INVESTMENT OR OTHER DECISIONS.
------------------------------
Copyright 2018 Thomson Reuters. All Rights Reserved.
------------------------------